Description: Attention for installation & operation
Before installation, the
cylinder should be first subjected to preliminary operation
under unload condition and accepted as qualified.
Choose the installation types according to the
service conditions and note the following
clauses with care during installation.
A.The apply force should be on the same plane when mounting the tongue and intermediate
shaft
pin.
B.When mounting the
flange ,the apply force and the support center should be on the
same shaft axis, The
flange and the
flange the fulcrum
bearing should with connected
that the
flange face is subjected to the apply force but not the set screw
subjected to the tensile force.
C.The
air cylinder piston rod should not be subjected to unbalance loading or lateral
load. The
air cylinder with over-length travel should be equipped with supporting
device or guide means. Before connecting the
air cylinder to the pipe, the
pipe should be first cleaned out so as to prevent waste from entering the
air cylinder. Fastenings should be often checked up in order to avoid losing.
If it is necessary, the throttle-valve can be regulated to adjust the buffer effect
and protect the
piston from colliding with the
cylinder head, which may damage
the
parts.