Description:
Features:
1) Can replace concrete, asphalt,
stone and other slope protection material
2) Mainly applied to slope of road, railway
and river lane, dams
and dikes,
andmountain slope
2) Can prevent land soil from
water and rain erosion before grass covering
grows
3) Can bear sourcing of high
water space
and high-speed
water after grass
covering grows
4) It can reduce cost of
construction by width margin
and the cost is only 1/7
concrete,1/8
stone5) It adopts macromolecule material
and anti-UV rays stability,
and its
chemicalcharacter is very stable,
and there is no pollution to environment
6) Easy
construction after surface of land is smooth
7) A kind of three dimensional structure new-type geosynthetical materials suitable for
protecting
water and land soil
8) Can effectively prevent
water and land soil from flowing away, increase green land
and improve living environment
Operation:
1) Can use
bamboo pole or
wood stick pass the whole roll net mat during
construction, then pull net mat along slope, use
wooden nail or
plastic nail
to fix four circle of net mat, distance between nails is 30cm, one square
meter has 10 nails
2) Length of nail from land surface is usually 15cm, add nails on loose land,
length of nail on up slope is longer than on down slope when
construction on
high slope
3) Pay attention to keep netting mat smoothly
and add nails on sudden change
place topography
4) Check carefully connecting. Length of connecting is 2cm, nail must be fixed
in connecting place, nails density is added 100%, there is no internal
and keep
net mat closely on up net mat. Width of bore diameter on up nail is two times
of netting mat hole, so can suppress on vertical direction
5) Depth of sowing takes actions that
suit local circumstance, chose long root
and suitable for local climate of grass seeds
6) Grass seeds sows in net mat, so can improve result of complex protect
coating
7) After sowing, land soil must cover the netting mat.
8) After sowing, 40-50%
water proportion in land soil is reasonable,
and adding pressure on surface of land, so benefit for grass seed's growing
9) Longitude of connecting should have 60-degree angle, netting mat must be
buried into land soil 30cm when laying on up slope. Bottom of slope should
higher than level land. Also, open a ditch 20cm from up slope, so can easily
irrigate
10) Lying time is earlier 3-4 months than rain season
Note:
1) Don't apply to surface of gravel
2) Please choose to use less than 45-degree angle slope
3) Don't apply to against-sea situation
4) Only apply to planting seeds for protecting slope, no making deepen
tendon-added material
5) Lying time is earlier 3 months than rain season when use in against-river
situation, which can guarantee the grass cover firmly form in or above normal
water degree
border=0>;