Description: 1, Outdoor Dropout Fuse Cutout (33KV) PEP-22
Technical specification:
Rated voltage: 30KV-33KV
Rated current: 100A / 200A
Breaking current: 10KA / 12KA
Impulse voltage (BIL) : 170KV
Power frequency withstand voltage: 70KV
Leakage distance: 720MM
2, Outdoor Drop Out Fuse Cut Out PEP-23
Technical specification:
Rated voltage: 33KV-35KV
Rated current: 100A / 200A
Breaking current: 8KA / 10KA
Impulse voltage (BIL) : 170KV
Power frequency withstand voltage: 70KV
Leakage distance: 820MM
3, Outdoor Drop Out Fuse Cut Out PEP-24
Technical specification:
Rated voltage: 12KV-15KV
Rated current: 100A / 200A
Breaking current: 10KA / 12KA
Impulse voltage (BIL) : 125KV
Power frequency withstand voltage: 45KV
Leakage distance: 350MM
4, Outdoor Dropout Fuse Cutout (27-33KV) PEP-G (f)
Technical specification:
Rated voltage: 27-33KV
Rated current: 100A / 200A
Breaking current: 6KA / 8KA
Impulse voltage (BIL) : 170KV
Power frequency withstand voltage: 70KV
Leakage distance: 1070MM
5, High Voltage Line Disc Type Suspend Insulators
High voltage line disc type suspend Insulator, use in high voltage aerial transferring distributed circuit for insulating and suspending lead. Normal component insulator bunch is used for ling of different voltage grade. Insulator has normal type and endurant-corrupt according to working surrounding and area, it has
ball type and groove type from connect method. The
products are all meet National standard (GB standard) , IEC standard and UK, US, German and Australia standard.
6, Standard suspension
glass insulators:
Fatigue durability, lightning protection no breakdown and no concealed defects in operating condition, and any damage can be visually identified. We have 70KN, 100KN, 120KN, 160KN, 210KN, 240KN, 300KN.
| Place of Origin: | China(Mainland) |
|---|
| Brand: | OEM service provided |
|---|
| Model No. : | PEP-22 |
|---|
| Payment Terms : | L/C T/T Western Union |
|---|
| Quantity: | 1000 Set/Sets |
|---|
| Minimum Order : | 1000 Set/Sets |
|---|
| Price Terms : | FOB |
|---|
| Packaging: | Pakage |
|---|
| Delivery Lead Time : | 30 days |