You are here : Home arrow Showroom arrow Products arrow Products arrow Heat Pump
Beijing Zhongke Jianye

Heat Pump

Heat Pump

Keywords: heat pump ,Heat Pump ,SBLGR01-05
Post Date: 2007-12-20
Description:
Cooperation Projects
Project Name: Project of yearly output of 200MW SBLGR series of ground water source heat pump units
Project Contents: This project covers an area of 160 mu, (10. 66hektare) , total building area 63640m2. The project will includes the raw materials of stores, semi finished articles stores Manufacturing workshops, Detecting workshops, finished products stores, office, science and technology buildings and affiliated housing so on. , and can finish the annual output of 200MW SBLGR series of water / ground source heat pump units.
Investment Evaluation and Capital Source: The total investment is US $24540000. It includes fixed assets investment US $23290000, Current assets US $1250000.
Market Analysis: Water / ground source heat pump is a new generation environment protection and energy saving central air conditioning units, it integrates three of functions of heating, cooling and hot water supplying; instead of traditional gas burning boiler and cooling towers and can be used widely in hotels, restaurants, offices, hospitals and residential for heating and cooling.
The units has the main features of environment protection, energy saving and high efficiency and have a huge market.
Investment Conditions: The project will be located in east of Dama village of YangshuiwuTownship in Anci District, Langfang City, the district satisfied the needs of Region domain development programming and with the good investment environments and advantage traffic, the project is suited to be built here.
Economic Profit Analysis: The normal annual sales revenues will be US $25640000 and the profit US $9020000, The return of capital employed can reach 36. 8% , internal yield 21. 41% , dynamic investment return periods 8. 15 years. (includes building periods of 2 years)
Progress of the Project:
Company situations: the company developed the heat pump units in 1998, have finished nearly 1000000M2 of the system engineering projects in many districts. We make full use of our advantage of building construction experience and provide the customers a full of service including system designing, producing, installing and after sale service.
We have our intellectual property, 2 of the utility new type patents and 2 of the new product certificate and 1 invention patent of heating for crude oil.
Progress of the Project: the relevant works have been finished, including the 3 grade environment estimate, land measure and peasants compensation and got the certificate of Province fixed asset investment register, An ci District building bureau approval of the site.
The project has been awarded the first important projects in Hebei Province.
Mode of Cooperation: Project joint venture, cooperation, Building the factory mutually import the project, Land transfer, Project transfer
Place of Origin:China
Brand:XIngye
Delivery Lead Time :30-40
Didn’t find what you want? Post a buying lead

Send a message
Print Page
E-mail
About Us |  Products  |  Trade Leads