Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

10 Inch Liyuan MMS 90kw 100kw 110kw 120kw 132kw 150kw 160kw 185kw AC Electric Groundwater Water Cooled Submersible Pump Motor

Price $1100.00
Min Order 2 Pieces
Availability In Stock
Shipping From Jiangsu, China
Popularity 319 people viewed
Model NO.:
10 inch Submersible Motor
Warranty:
2 Years
Max.Head:
30-50m
Max.Capacity:
50-100 L/min
Driving Type:
Motor
Material:
Stainless Steel
Structure:
Multistage Pump
Assembly:
Water Motor
Power:
Electric
Start Up:
Electric Pump
Type:
Water Pump
Application:
Submersible Pump
Industry:
Solar Water Pump
Media:
Water Pump
Performance:
Automatic Pump
Theory:
Centrifugal Pump
Solar Water Pump:
Solar Water Pump
Water Motor:
Water Motor
Solar Pump:
Solar Pump
8 Inch Submersible Motor:
10 Inch Submersible Motor
Submersible Motor:
Submersible Motor
AC Submersible Motor:
AC Submersible Motor
Trademark:
LiYuan
Transport Package:
Tora
Origin:
China
Product Description

10 Inch Stainless Steel Water Cooled Groundwater Submersible Pump Motor 

DescriptionSubmersible Motor
SpecificationAC Motor
Motor Size10 Inch
Power30kw  37kw  45kw  55kw  64kw  75kw  90kw  100kw  110kw  120kw  132kw  150kw  160kw  185kw 
40HP  50HP  60HP  75HP  90HP  100HP  125HP  135HP  150HP 160HP  180HP  200HP 215HP  250HP 
VolotageAC 50Hz   60Hz   220V,380V , 460V  660V
MaterialStainless steel
MediumClear water,
Hot water
Acceptance customized for acid and alkaline water 
ControllerAC Solar Inverter :MPPT
AC Electric Controller
PowerElectric,   Solar
BrandLiyuan ,ATA, MMS, Accept custom brand

 

       




FAQ

Factory Information

Guangdong Jiangmen Liyuan Pump Co., Ltd. has started its production of submersible water pumps since 1992. It is an ISO 9001:2008 approved factory and all products have passed CE standard.

 Product Feature
1) CE standard approved.
1) Unqiue Item number.
2) Thicker pipe wall than normal product in the market.
3) Bearing: domestic, NSK,etc.
4) Self-design impellers.
5) 100% brass wire, bigger and deeper slot for motor.
6) Strictly quality control from material receiving, pre-entering warehouse to exiting warehouse and packing.

Delivery Time
Normal lead time: 7 - 15 days based on the order quantiy.
  • Similar Products
Full Page Contact Supplier