100 M/Min Automatic Press Paper Bag Printer Karft Printing Machine with High Quality
| Price | $24000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 299 people viewed |
| Number of printing colors | 2/4/8colors |
| Maximum paper width | 1320 |
| Maximum printing width | 1300 |
| Printing length | 300mm -900mm |
| Registration accuracy | ±0.10mm |
| Maximum machine speed | 80 m/min |
| Electricity demand | 380V 50Hz 3PH |
| Maximum power | 180kw |
- Single unwind system, pneumatic loader for unwind system
- Automatic stop machine when break the material; When machine stop, keep tension and avoid the material loose or line deflection.
- Air shaft
- EPC (edge position control): With manually/automatically/ central return function, can adjust the rewind move left and right .
- Automatic tension control system with magnetic brake(20KG).
- Roller core diameter: 76mm
- Discharge maximum diameter: 1000mm
- plate roller circumference: 300-1000mm, standard less than 400mm
- print material: resin plate or rubber plate
- Transmission between printing roller and anilox roller: Helical gears
- printing chromatography: 360-degree rotation
- adjustment method: By Manual (Automatic printing after adjust by manual, when start machine, no need register color again, the printing pressure and register all keep the same.)
- Printing roller lifting system: Automatic Hydraulic cylinder control roll up and down.
Drying system:
- The machine is equipped with blower and heater; and the heater employed central temperature control system
- Dry apparatus between each color, and one more dry apparatus after printing finished
Rewinding Part:
- Single rewind system, pneumatic l loader for rewind system
- Film central rewind system
- Air shaft
- Roller core diameter: 76mm
- Discharge maximum diameter: 1000mm
Q1. How long will your engineer reach our factory?
Our After-sales Specialist would contact you to confirm the final scheduling according to your reasonable request.
Q2. How many days will you finish installing?
We will finish installation and training within 1-2 weeks.
Q3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets,SIM card, hotel, food, and also their salary 150USD one day per person.
Q4. How long is your machine's warranty period?
All our machine have one year guarantee, starting from finished installation.
Q5. How could we do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
Q6. Does your engineer speak English?
Our engineers understand a little English. All of our engineers have more than five years machine installation experience.
Q7. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case any problem, you can contact our after sales specialist at any time. There are 30 engineers at our after-sales department with 30 engineers and they'll take solution videos according your description.
- Similar Products