Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

100% Vrigin PTFE Skived Film

Price $9.00
Min Order 100 kg
Availability In Stock
Shipping From Jiangsu, China
Popularity 283 people viewed
Certification:
RoHS, REACH, ISO, MSDS
Customized:
Customized
Type:
Adhesive Tape
Feature:
High Strength, Waterproof, Water Absorption
Color:
White
Material:
PTFE
Gavity:
2.15--2.25g/cm3
Tensile Strength:
25MPa
Elongation:
250%
Melting Point:
330ºC
Temperture:
-180ºC--260ºC
Trademark:
CHUNHUAN
Transport Package:
Plastic Bag, Carton Box
Specification:
Thickness 0.02--8.0mm
Origin:
China
HS Code:
3920991000
Product Description
Production Descripation 

    
ItemValueUnitTest Method
Thickness0.02 to 0.50mm 
Toleracne0.020 to 0.10 (±0.003)
0.11 to 0.20 (±0.008)
0.20 to 0.50 (±0.02)
mm 
gravity2.15-2.25g/cm3D792
Tensile strength25MpaD-882
Elongation at break250%D-882
dielectric constant, 1KHz2.1KV/mmD-150
volume resistivity 1×1017Ωcm 
arc resistance 180sec 
melt point330ºCD-3418
temperature resist range-180 to 260ºCD-3418
 
Photos of products


Our Service
1)Your inquiry will be replied within 2 hours during working time,Within 24hours when rest time.
2)Our working time is 7.30 AM --17:30 PM,Monday to Saturday.
3)General samples time can be arranged within 2--5days.
4)Orders will be produced exactly as request and approved samples.
5)When mass production,we send photos to show the production line.And confirm the estimate time again.
6)At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.
7)Before shipment,our QC will have inspection to make sure the quality.
8)We always try best to ensure every order to delivery in time.
 
Payment Terms
1)T/T,Cash,L/C.
2)30% deposit,70% balance before shipment.
3)Lead time: 15 days after received deposited for 2tons.
4)Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,FedEx.
 
Packing & Delivery

For sample: By EMS,DHL,UPS,TNT,FedEx
               around 5--7 working days to arrive
 
For Bulk order:
1.Qty of 2tons,within 15 days.
2.Via Sea
3.Delivery time:we will finish production in 15days for 2tons.
4.For 20 GP,may nee around 30days.

 

 
  • Similar Products
Full Page Contact Supplier