$3000.00
1 set (MOQ)
Folding Stairs on The Platform for Tank Farm
Lianyungang Zhanxing Machinery Co., Ltd.
Swipe or use the arrows to view product images.
10m³ Vacuum Insulated Cryogenic Tank with 8bar Pressure
| Price | $2000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 512 people viewed |
After-sales Service:
1 Year
Warranty:
1 Year
Condition:
New
Customized:
Customized
Certification:
ISO9001
Tank Marerial:
Metal Tank
Type:
Low Temperature Storage & Transportation Equipment
Storage Objects:
Liquid
Storage Medium:
Lin
Conventional Pressure Level:
8bar
Filling Rate:
95%
Color:
Customized / Standard [White]
Trademark:
Doer
Transport Package:
1208022259885731840
Specification:
10m3
Origin:
China
HS Code:
8609001100
Product Description
The microbulk tank is a compact jacket-type vacuum multilayer insulation (vacuum powder insulation) cryogenic pressure vessel used for storing and supplying cryogenic liquefied gases. This delivery system replaces liquid cylinders with a stainless steel storage tank. It can help you improve safety while freeing up valuable floor space on your site.
| Design code | ASME Boiler and Pressure Vessel Code Section VIII Division 1 -2023; | |
| GB/T150.1~4-2011 "Pressure Vessels"; | ||
| GB/T18442.1~6-2019 "Static vacuum insulated cryogenic pressure vessel" | ||
| Type | Vertical | |
| Storage Medium | LIN | |
| Insulation Type | High Vacuum Multilayer Insulation | |
| Working Pressure | 0.8~3.3MPa or customized | |
| Volume | 10 m3 | |
| Filling rate | 95% | |
| Design Temperature | Inner Vessel | -196ºC |
| Outer Shell | 50ºC | |
| The Main Material | Inner Vessel | 06Cr19Ni10 |
| Outer Shell | Q345R | |
| Painting | Primer + intermediate coat + topcoat (3 layers) | |
| Color | Customized / Standard [white] | |
| Design service life | 20 years | |
| Warranty | 1 Year | |
| Transport Package | Nude | |
| Mode of transportation | Road, Sea or Railway | |
Technical Requirements
1. Centralized gas supply system on pallets skid: collect storage tank, pressure build-up vaporizer, main vaporizer, and pipelines. The stored liquid can be directly vaporized into gas, making it convenient for users to use.
2. For the inner vessel of the storage tank, 100% Radiographic Testing (RT) is first performed on Category A and Category B welded joints. This is followed by 100% Penetrant Testing (PT) on all welded joints. After ensuring that the non-destructive testing results are qualified, a pneumatic test is conducted on the inner vessel. Finally, each weld and joint is subjected to a leak test using a helium mass spectrometer leak detector. ,AB100%(RT),100%(PT)
3. The finished paint film on the outer surface of the storage tank is dense, firm and reliable, and the dry film thickness of the paint is greater than 200 µm.
4. The tank needs to be replaced with nitrogen before leaving the factory. Fill the interior of the liquid container with 0.03~ 0.05Mpa pressure nitrogen gas for protection. ,0.03~0.05Mpa.
5. The installation of LIN mircobulk tank does not require a foundation and can be directly placed on the ground for use with low maintenance costs. It is widely used: in the field of scientific research, it provides a stable low temperature environment for low temperature experiments, superconductivity research, biological sample preservation, etc.; in industry field, it is used to protect electronic components from oxidation during welding and packaging in the electronics industry; and it can be used as a purge and replacement gas in chemical production.
1. Centralized gas supply system on pallets skid: collect storage tank, pressure build-up vaporizer, main vaporizer, and pipelines. The stored liquid can be directly vaporized into gas, making it convenient for users to use.
2. For the inner vessel of the storage tank, 100% Radiographic Testing (RT) is first performed on Category A and Category B welded joints. This is followed by 100% Penetrant Testing (PT) on all welded joints. After ensuring that the non-destructive testing results are qualified, a pneumatic test is conducted on the inner vessel. Finally, each weld and joint is subjected to a leak test using a helium mass spectrometer leak detector. ,AB100%(RT),100%(PT)
3. The finished paint film on the outer surface of the storage tank is dense, firm and reliable, and the dry film thickness of the paint is greater than 200 µm.
4. The tank needs to be replaced with nitrogen before leaving the factory. Fill the interior of the liquid container with 0.03~ 0.05Mpa pressure nitrogen gas for protection. ,0.03~0.05Mpa.
5. The installation of LIN mircobulk tank does not require a foundation and can be directly placed on the ground for use with low maintenance costs. It is widely used: in the field of scientific research, it provides a stable low temperature environment for low temperature experiments, superconductivity research, biological sample preservation, etc.; in industry field, it is used to protect electronic components from oxidation during welding and packaging in the electronics industry; and it can be used as a purge and replacement gas in chemical production.
- Similar Products
$15000.00
1 Set (MOQ)
10 M3 of Cryogenic Liquid Tank for Lox / Lin / Lar
Yangzhou Giant Machinery Co., Ltd.
$50000.00
1 Piece (MOQ)
R22 R134A R404A Transportation Storage ISO Tank for Refrigerant
WOBO Industrial Group Corp.