Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

11/2" and 2" Steel Flange for Awwa Meter

Price $5.50
Min Order 4000 Pieces
Availability In Stock
Shipping From Zhejiang, China
Popularity 517 people viewed
Model NO.:
H933R
Standard:
AWWA C700
Type:
Threaded Connection Flange
Material:
Cast Steel
Structure:
Flanges
Connection:
Screws
Sealing Surface:
FM
Manufacturing Way:
Casting
Product Name:
11/'' & 2'' Steel Flange for Awwa Meter
Size:
11/2'', 2''
Surface:
Paint
Trademark:
OEM or PLB
Transport Package:
Carton+Pallet
Specification:
11/2'', 2''
Origin:
China
HS Code:
73079900
Product Description
11/2" and 2" Steel Flange for AWWA Meter

Size: 11/2'', 2''

The kit contain 2 flanges, 2 rubber washers, 2 bolts, 2 nuts, 2 stell wahers.


Our company is a professional manufacturer and exporter in hydraulic, water plumbing and heating scope. Our products include brass ball valves, brass gate valves, brass stop valves, bronze valves, brass bibcock, brass fitting, bronze coupling, brass manifold, water meter and all kinds of water meter parts. Such water meter body, water meter fitting and water meter flange. Our product material include brass(CuZn40Pb2), bronze(C83600 and C84400), CW614N, CW617N, CZ122, free lead bronze and brass etc.
PackingBox+Carton+Pallet
Payment term:T/T, or L/C at sight
Delivery time:Within 25 days
Origin:China
M. O. Q:  2000PCS
Transportation:  By sea or air
TechnicsBy  casting
Materialsteel
ConnectionThread & Flange

Production

Packaging & Shipping

Product Testing

Main Products

FAQ

1. Is sample available before normal order?
Yes! But customer need to bear express cost. Samples are free. 
2. What is your MOQ?
Usually our MOQ is 2000-3000pcs for small size. For big size(11/4"-2"), it is 200-1000pcs. But, it is based on products value.
3.How long is the production lead time?
Commonly, it takes 30-35 days. It is depend on material requirement. If it is special material, delivery term will long.
4.Is OEM accepted?
Yes! We can print your logo on the body or cartons.
5. What is your terms of payment ?
30% deposit in advance,the balance by T/T in 10 days after the B/L Copy.
If you have another question, pls feel free to contact us.

  • Similar Products
Full Page Contact Supplier