Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

12 Hours Injection System Patient Extension Line Tube Non-Return Check Valve, 150cm 12hours Multiple Use Drip Chamber Pressure Coiled Filling Connecting Tubing

Price $3.00
Min Order 1000 Sets
Availability In Stock
Shipping From Guangdong, China
Popularity 286 people viewed
Model NO.:
D1L111 / D1L105 / D1L110 / D1L010 / D1L005 / D1L
Sterilization:
Sterilization
Feature:
Disposable
Application:
Clinical, Household
Material:
Plastic
Certification:
CE, ISO13485
Power Type:
Without Power
Group:
Adult
Place of Origin:
Guangdong, China
Length:
150cm /60inch
Quality Certification:
CE ISO13485
Trademark:
xway
Transport Package:
Carton
Specification:
58x42x42cm, 75x41x49cm
Origin:
Chiina
HS Code:
90183100
Product Description
 Medical 150cm 12hours Multiple use drip chamber pressure coiled filling connecting tubing 12 hours injection system patient extension line tube non-return check valve


REF:  D1L111 / D1L105   / D1L110 / D1L010 / D1L005 / D1L011 / D1L106/ D1L006

 

 

P/N: 0402-001-1942

VOL./ml  Length/cm: 150cm

Package (pcs/carton): 100

 

Detail Information:

Dual Mtrans tubing system with 2 dripchambers. Including a 150cm coiled Patient Extension with new connector. To be connected to a patient line. Component pressure limit is 350PSI/ 24bar.

 

Product Purpose:

for filling and injecting CT- and MR contrast media as well as 0.9% physiological saline solution.

 

Operation Time:

Single Use

 

Compatibility:

Compatible with all brands and types with dual piston injector technology.

 

Patient Line Length: 150cm

Patient Line Shape: Coiled

Spike: Yes

Pressure: 350psi/24bar

Drip Chamber: drip-chamber


 


 
 

             

 

 Shipping Detail:

 

Producing Lead time:  2-4 weeks after payment received, depends on your order quantity

 

Delivery  Method: 

1. By Express:  Fedex, UPS, TNT, DHL, SF express      3-5day, 5-7days.

2. By  Road:    Domestic and neighbour country :  3-10 days

3. By  Sea :    5-45 day all over the world.

4. By Air :     5-10 days all over the world.

 

Loading port :

 

Shenzhen, Yantian, Shekou, Hong Kong, Xiamen, Ningbo, Shanghai, Nanjing, Qingdao

According to your requirement.

 

Delivery Terms:

 

EXW, FOB, CIF, CFR, C&F, DDU, DDP, FCA, CPT

 

Shipping Documents:

 

B/L, Commercial Invoice, Packing List, [CO/FORM  A, FORM E, CIQ, CE, ISO13485]

 

 

 
Shenzhen X-Way Medical Technology Co.,Ltd 
Attn: Melissa Xu

 
 
  • Similar Products
Full Page Contact Supplier