$1000000.00
1 Piece (MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
Runh Power Corp., Ltd.
Swipe or use the arrows to view product images.
15 MW 20 MW 30 MW 50 MW 100 MW 300 MW 600 MW Agricultural Straw Rice Husk Biomass Waste to Power Plant
| Price | $1000000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 496 people viewed |
Model NO.:
Power plant
Voltage:
380V
Generating Methods:
Thermal Power Generation
Phase:
Three Phase
Power:
10MW - 100MW
Fuel:
Coal, Gas, Oil, Biaboss etc
Customerized:
Available
Trademark:
RUNH
Transport Package:
Standard Packing
Specification:
15mw POWER
Origin:
China
HS Code:
8402119000
Product Description
| Description | Power Plant |
| Capacity | 10MW-1000MW |
| Warranty period | One year |
| Fuel | Biomass |
| Service | Professional design, construction, installation and offer the whole complete line of equipments and spare parts |
Who We Are
Runh Power is an EPC contractor and complete equipment supplier in China, which has performed more than 20 international power projects in Turkey, Ukraine, India, etc. With 28 years' development, now we provide EPC/turnkey service and complete set of equipment such as STG, BTG, BOP, etc for all kinds of power projects such as coal fired power plant, biomass power plant, CCPP, waste heat power plant, new energy power plant, etc.
What We Offer
1 Professional design institute:
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes.
2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.
3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.
5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.
We own independent design institute, about 50 experienced and Professional engineers for all systems of power plant in our design institute, they could make proposals for power projects of various sizes.
2 Cost effective equipment:
We establish cooperative relationship with domestic well-known OEMs, their products employs the most advanced technology and their quality could be guaranteed. And they provide equipment for us with a relatively competitive price. Besides, we have undertaken 28 international power projects which also could prove that our products and services are very competitive.
3 Competitive delivery time:
Time is very important, especially for power projects and we could guarantee and provide competitive delivery time. In order to achieve this goal, we mainly have 4 steps:
Step 1: Design, our design institute could guarantee the design schedule;
Step 2: Manufacturing, our cooperative OEMs will arrange our order preferentially;
Step 3: Local branch, we have 4 local branch in domestic, and they will manufacture the manufacturing schedule and quality of our orders.
Step 4: Rich experienced and professional team, our team have accumulated rich experience and they could solve the problems and risks and avoid potential delays in delivery.
4 After-sales service;
Many owners worry about this, especially for international power projects and we provide complete after sales service to reduce your risks such as one-to-one service system; periodic visiting; customer documents; global maintenance team, etc.
5. Second hand equipment
We own abundant second-hand equipment which are under quite good condition, their price is much cheaper and the construction period could be shorter. We provide all round service for secondhand equipment such as Renovation & equipment retrofit ,Re-location of power plant, Unit capacity upgrade, Performance upgrade and energy saving proposal, System upgrade (Instrumentation, energy efficient electrics, etc.) And what's more, we provide the same guarantee period compared with new equipment.
Our Power Plant Projects
Our Certifications
Our Certifications
- Similar Products
$1000000.00
1 Piece (MOQ)
Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
Runh Power Corp., Ltd.
$150000.00
1 Piece (MOQ)
Francis Turbine Mixed Flow Hydro Turbine Generator for Hydro Power Generation
Runh Power Corp., Ltd.
Negotiable
1 Piece (MOQ)
Coal Fired Power Plant Equipment Supplier and EPC Contractor
Runh Power Corp., Ltd.