Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

2 Phase 42HS Step 110mm NEMA42 Hybrid Step/Stepping/Stepper Motor for CNC Machine

Price $117.15
Min Order 1 Piece
Availability In Stock
Shipping From Jiangsu, China
Popularity 254 people viewed
Model NO.:
42HS
Application:
CNC Machine, Cut Equipment, Print Machine
Speed:
Variable Speed
Number of Stator:
Three-Phase
Excitation Mode:
HB-Hybrid
Function:
Control
Number of Poles:
100
Type:
Electromechanical
Certification:
ISO9001
Brand:
Thank
Sample:
Available
Warranty:
1 Year
Transport:
Vessel, Air, Express
Trademark:
THANK
Transport Package:
Export Standard Package
Specification:
11.2N. m, 13.5N. m, 22N. m, 30N. m
Origin:
China
Product Description
2 Phase Size 110mm NEMA 42 Hybrid Stepper/Stepping/Step Motor




Shaft types:

Motor End:


Application:

Packing:
Hard cardboard or wooden box with foam inside.


Shipping:
Normally the delivery time is within 10 days according to customer's choice or ship by the best express company to the destination.



Delivery:
1.with over 17 years of manufacturing experience, any type of customizing is available.
2.with perfect service system, we can provide you with first class pre and after sale service.
3.we have enough storage of each type of products, with first class packaging and shipping, make sure  accurate delivery.
4.professional sales consultants give you all answers about our proucts.

Certificate:

FAQ: 
Question1: What is your service time:
Answer: 24 hours online service. Email will be replied within 12 hours.

Question2: What about your products' warranty?
 Answer: 1 year. For sea orders, the warranty is 15 months.

Question3: Do you have any certificate?
Answer: Yes we have. Our factory passed ISO9001 and SGS verified. All motors have been approved by CE.

Question4: Do you offer ODM and OEM Service?
Answer: Yes. ODM products according to customized design and specification as well as OEM products.

Question5: What is the delivery time?
Answer: For samples, 10-30 days according to the differnet produced difficulty. For bulk, normally 20-30 days. For customized order, the delivery can be negotiated.
  • Similar Products
Full Page Contact Supplier