2 Years Fully Automatic Lithium for EV Ess Battery Pack Production Line
| Price | $1500000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Henan, China |
| Popularity | 364 people viewed |
Module Line Workflow
| NO | Item | Parameter |
| 1 | Line Efficiency | 12PPM Piece Per Minutes |
| 2 | Line Output | 1.5Gwh Per One Year Per One Shift |
| 3 | Line Demension | L*W*H:80m*16M*4M |
| 4 | Line Apprerance | Custom |
| 5 | Line Final Yield Rate | ≥99.8%(only |
| 6 | Line Failure Rate | <=2% |
| 7 | Line Power Request | 20V,50~60Hz/380V,50~60Hz |
| 8 | Line Air Request | Compressed Air Pressure 0.5~0.7MPa |
| 9 | Lead Time | 40-45 days for manufacturing to ensure precision and quality. 10-15 days for internal testing to guarantee optimal performance before shipment. |
Since its establishment in2019, Yao Laser has continuously advanced the development and application of laser technology, providing customers with high-quality, high-performance laser equipment and Battery Module PACK Automated Production Lines, and CCS Intelligent Manufacturing Production Line.
Q1.How do you ensure precision in prismatic cell alignment and stacking?
A1: Advanced vision-guided robots and AI-based alignment systems ensure micron-level precision. Fixtures and jigs are custom-designed for cell dimensions.
Q2. What automation level is achievable for prismatic pack assembly?
A2:Fully automated lines can achieve 20-50 Module per hour (PPH), with robotic handling for cell stacking, welding, and inspection. Semi-automated lines are cheaper but slower.
Q3. How is safety ensured during assembly (e.g., short circuits, thermal runaway)?
A3::Dry room environments (<1% humidity).
Insulation checks and Hi-Pot testing.
Thermal imaging during welding.
Post-assembly tests for overcharge/over-discharge resistance.
Q4. Can the same line handle different prismatic cell sizes (e.g., 50Ah vs. 100Ah)?
A4: Yes, with modular tooling and programmable robots. Quick-change fixtures reduce downtime for cell size adjustments.
Q5. What is the production capacity of a standard assembly line?
A5:: Depends on automation:
Manual/Semi-Auto: 5-10 PPH.
Fully Auto: 20-50 PPH.
High-volume EV lines can exceed 100 PPH.
Q6. How is thermal management integrated into the assembly process?
A6: Cooling plates (liquid/air) are bonded to modules during stacking. Thermal interface materials (TIMs) are applied via automated dispensers.
Q7. What certifications are critical for prismatic pack assembly lines?
A7:ISO 9001 (quality management).
CE/UL (safety compliance).
- Similar Products