Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

200m3/Hour Dry Land Gold Washing Plant's Price

Price $50000.00
Min Order 1 Set
Availability In Stock
Shipping From Shandong, China
Popularity 552 people viewed
Model NO.:
YLGWP-200
Type:
Gravity Separator
Voltage:
380V
Weight:
5T
Material:
Casting Steel
Material Feature:
Wear Resistance
Certification:
SGS
Energy Saving:
Energy Saving
Warranty:
1 Year
Color:
Customized
Customized:
Customized
Condition:
New
Water Consumption:
80m3/Hour
Deal Capacity:
100-250m3/Hour
Trademark:
YONGDELI
Transport Package:
Nude Packing
Specification:
6000*1700*2300
Origin:
Shandong
Product Description

200m3/hour dry land gold washing plant's price
 

1. Company information

Qingzhou Yongli Mining and Dredging Machinery Co., Ltd located in Qingzhou city, is a leading company of sand/gold/diamond mining equipments, which has more than 25 years experience in producing bucket chain sand dredgers,cutter suction dredgers, diamond/gold dredgers, gold washing plant, sand washing plant, work boat,transport barge and so on .
Successful series of products have won the Recognization and approval of general administration of Quality Supervision. Welcome to our factory for discussion!

2. Gold washing plant Description

Yongli gold washing plant used to mine gold mixed with sand in palaeochannel, palaeo-riverbed, alluvial placer, tailing after ball milling, and diamond and zirconium in raw ore. If the percentage is high in the raw ore, Iron ore needs to be retrieved first with magnetic separator, then gold, diamond, zirconium will be concentrated, or the effectiveness will be affected. 

This set of mining equipments are composed of several gravity  concentrators. The concentration ratio could reach as high as 1:1000, and the recovery efficiency about 90% after series of separation.

 

3.Advantages

1.provide outstanding production capability suitable for a   huge-operation site.

2. make it easy to collect gold particle from raw materials

3. be suitable for a small site or pilot production for site survey

4.have environment hardened structure to work in the coldest or the hottest weather without any problem

5. one operator  manages several equipments  

6.be easily immigrated and installed in the site by using fork lifts and others

7.simple replacement and collecting of gold-dust-gathering mat

4.Technical Specification

ModelCapacity(m3/hour)Power(kw)Water Consumption(m3/h)Particle size(mm)Recovery Percentage(%)
YLGWP-10010092200<30085-90
YLGWP-150150100300<30085-90
YLGWP-200200106400<30085-90
YLGWP-250250118500<30085-90

5. Picture Show



 

 

  • Similar Products
Full Page Contact Supplier