Swipe or use the arrows to view product images.
2022 Factory Hot Sale Beige Fabric Dining Chair with Metal Wood Color Legs
| Price | $24.50 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 303 people viewed |
Model NO.:
OKC-1251
Style:
Modern
Material:
Fabric
Usage:
Hotel, Home, Restaurant
Armrest:
Without Armrest
Color:
All Colors Available
Folded:
Unfolded
Rotary:
Fixed
Customized:
Non-Customized
Shape:
Square
Condition:
New
Certificate:
BSCI, FSC
Factory Location:
Hebei
Delivery Time:
30-45 Days After Deposit
Shipping Port:
Xingang, Tianjin
MOQ:
100PCS
Seat&Back:
PU or Fabric
Legs:
Black Powder Coating Legs
Packing:
2PCS/CTN
Volume:
0.085
Loading Ablity:
1000PCS/40hq
Max Load Weight:
120kg
Payment:
Tt, LC
Trademark:
OKAY
Transport Package:
Carton
Specification:
49*56*83*48CM
Origin:
China
HS Code:
9401719000
Product Description
| Product Name | Dining chair | MOQ | 100pcs |
| Model No. | OKC-1251 | Packing | 2pcs/ctn |
| Brand | OKAY | 40HQ Load ability | 850pcs |
| Seat&back | PU or fabric | Shipping port | Xingang, Tianjin |
| Legs | Powder coating | Delivery time | 30-45 days |
Packing & Inspection
FAQ
1. How about your quality ?
We have QC department, they control every process, start from purchasing raw material to finish the goods and loading the container.
2. What is your MOQ ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .
3. If we want a sample, how much do we need to pay ?
We usually charge 2 times price, and the transport fee should be paid by buyer, we will reture the extra money when you place order.
4. Where is your factory locate? How can I visit it ?
Our factory is located in Shengfang town, Bazhou, Hebei province, China. It takes just one hour to our factory from Tianjin Airport. We can pick you up from Tianjin Airport or Beijing Airport.
5. Do you participate in any exhibition ?
Yes, we participate in Canton Fair, China International Furniture Expo in Guangzhou and Shanghai every year. You are very welcomed to visit our booth.
6. What is the leading time for mass production ?
It depends on the order quantity and the product. Usually our leading time is 30-45 days for one container after order confirmed.
If you have any interest, please feel free to contact us. Thank you !
- Similar Products
$30.00
50 Pieces (MOQ)
Modern Red Oak Dining Chair with Padded Seat
Finto (Dezhou) International Trading Co., Ltd.
$11.00
50 Pieces (MOQ)
2020 New Plastic PP Outdoor Bamboo Banqueting Chair Wedding Chair
Leading Hardware Co., Ltd.