Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

2205 Steel Pipe Production Line Welding Ss Tube Machines Duct Making Line

Price $296300.00
Min Order 1 Set
Availability In Stock
Shipping From Guangdong, China
Popularity 432 people viewed
Model NO.:
SZG-40/50/60/70
After-sales Service:
Engineers Service Machinery Overseas Available
Warranty:
1 Year
Pipe Material:
Stainless Steel
Condition:
New
Customized:
Customized
Theory:
Inverter
Application:
Industry, Decoration
Type:
Pipe Production Line
Product Name:
Roller Quickly Change Type Tube Mill Line Steel Pi
Main Voltage:
220/380/415/420/440V
Pipe Diameter:
12.7-50.8mm
Thickness:
0.5mm-3.0mm
Capacity:
3-15m/Min
Horizontal Roller:
50mm
Vertical Roller:
40mm
Voltage:
380V 50Hz
Roller Material:
42CrMo/ SKD11
Certification:
ISO9001
Use Life:
20 Years
Color:
Customized
Lead Time:
120 Days
Principle:
Inverter
Welding:
Tt, Tp, Laser Welding
Trademark:
Hangao Tech
Transport Package:
Waterproof Film and Pallets
Specification:
Customized
Origin:
China
HS Code:
8455102000
Product Description

2205 Steel Pipe Production Line Welding Ss Tube Machines Duct Making Line


 

Product Description

Product Details

Product Parameters

 

TypeMaterialWelding typeO.D.
(mm)
Thickness (mm)Motor Power (KW)Size(L*W*H)(m)
SZG-30SSTTIG6-160.4-1.55.5customized
SZG-40SSTTIG16-50.80.5-2.57.5customized
SZG-50SSTTIG25.4-760.5-3.011customized
SZG-60SSTTIG50.8-1141.0-4.015customized
SZG-80SSTTIG89-1681.0-5.018.5customized
SZG-100SSTTIG114-2192.0-8.030customized
SZG-120SSTTIG168-3253.0-10.037customized
Detailed Photos

 

Process Flow
Certifications

Our Partner

Packaging & Shipping

 

Related Product

 

FAQ

FAQ   

1. Which countries your products are exported to?
Our products are sold all over the world and with related certifications.

2.How about the warranty?
All our products have one year quality warranty, during the warranty time, the spare parts replacement is free. And we provide life long time technical support and other assistance.

3.How to install your machine?
Usually speaking, engineers will be sent to your factory to help to install and adjust the machines. We also have paper installation instructions and videos, teaching you till you command it.

4. Which export port you use?
Any China ports. Commonly, we will use Shenzhen port. But it can be appointed as you like.

5. How about the payment terms and delivery time ?
Payment terms for small machines: 100% T/T/ Western Union/Cash in advance.
The big machines and big amount: 40% deposit, 60% before shipment (we will shoot total delivering process for customer's confirmation) and the related papers. You can pay by T/T,L/C, Western Union or other ways.
The machine delivery time is within 45-90 days.

6.Is your goods with ISO9001 or CE certificate ?
Yes, all our goods has ISO certificate. All machines are high quality goods.

7.What is your nature of your company:dealer or factory ?
We are manufacturer with a big factory ,warmly welcome to visit our factory and contact us. 



Contact Us

  • Similar Products
Full Page Contact Supplier