Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

3 Phase Submersible Motor Winding, 7.5HP Submersible Pump Motor

Price $1000.00
Min Order 1 Piece
Availability In Stock
Shipping From Guangdong, China
Popularity 531 people viewed
Model NO.:
4-30HP-3
Task:
Adjust
Structure:
Closed-Loop
Mathematical Model:
Linear
Signal:
Continuous
Function:
Automatic Control
Certification:
ISO: 9001, CE
Condition:
New
Customized:
Customized
Material:
Stainless Steel
Name:
3 Phase Submersible Motor Winding, 7.5HP
Usage:
for Submersible Pump
Hull Material:
Stainless Steel
IP Grade:
IP58
Power:
4-37kw (3 Phase)
Voltage:
360-400V
Axial Pressure:
15.500n
Insulation Grade:
B
Temperature Tolerance:
40 Degree Celsius
pH Requirement:
6.5-8
Trademark:
Liyuan
Transport Package:
Plywood Case
Specification:
4-30HP
Origin:
China
HS Code:
8501400000
Product Description
3 Phase Submersible Motor Winding, 7.5Hp Submersible Pump Motor

1. Product Details
Water Cooling (380V+-5% 50/60Hz)
Motor PowerCurrentPower FactorRotation SpeedLengthWeight
HPkWACOSrpmmmkg
5.549.30.79285063127.4
7.55.5130.8285069132.3
107.516.50.8285072138.2
12.59.2210.81285078141.1
1511240.81285078142

Oil Cooling (380V+-5% 50Hz)
Motor Power CurrentPower FactorRotation SpeedLengthWeight
HPkWACOSrpmmmkg
4370.68285070140
5.54100.79285073243
7.55.5130.8285076948
707.516.50.8285080450
12.59.221.50.81285083453
151125.50.81285095668
17.513310.81285099676
2015340.812850104686
2518.5380.812850116694
3022430.8128501241101







2. Factory Information
Guangdong Jiangmen Liyuan Pump Co., Ltd. has started its production of submersible water pumps since 23 years ago. It is an ISO 9001:2008 approved factory and all products have passed CE standard.


3. Product Feature
1) CE standard approved.
1) Unqiue Item number.
2) Thicker pipe wall than normal product in the market.
3) Bearing: domestic, NSK, SKF, etc.
4) Self-design impellers.
5) 100% brass wire, bigger and deeper slot for motor.
6) Strictly quality control from material receiving, pre-entering warehouse to exiting warehouse and packing.


4. Delivery Time
Normal lead time: 7 - 15 days based on the order quantiy.

5. Contact Us


  • Similar Products
Full Page Contact Supplier