Negotiable
1 Ton (MOQ)
R3 R3s R4 R5 Marine Offshore Mooring Anchor Chain
China Shipping Anchor Chain (Jiangsu) Co., Ltd.
Swipe or use the arrows to view product images.
3500lbs Iron Safety Trailer Chain, Transport Chain with S-Hooks with Latch
| Price | $1.00 |
|---|---|
| Min Order | 10 Sets |
| Availability | In Stock |
| Shipping From | Jiangsu, China |
| Popularity | 508 people viewed |
Model NO.:
5/16"
After-sales Service:
1 Year
Warranty:
1 Year
Application:
Yacht
Standard:
ASTM, GB, ISO
Customized:
Customized
Surface Treatment:
Galvanized
Material:
Steel
Type:
Ring
Trademark:
fresh chain
Transport Package:
Wooden Pallet
Specification:
8mm
Origin:
China
HS Code:
7315200000
Product Description
3500lbs Iron Safety Trailer Chain,Transport Chain with S-hooks with latch
Product Description :
Safety chain hoist Safety Chain,Transport Chain with Hook 1. Item name: 3500lbs Iron Safety Trailer Chain,Transport Chain with Hook 2. Usege:transform and proction chain 3.Working load:3500lbs(1500kgs) 4.Chain length:122cm
product name | clevis hook |
package | Usually packed in plastic bags, and then in export carton, high quality pallets ;According to your requirements. |
simple | available |
feature | high strength |
application | ships, steel, petrochemical industry, coal mine |
payment | T/T L/C Western Union |
colour | according to requests |
Delivery Detail | Usually 15-20 working days after receiving your advance payment. |
certification | ISO9001 CE SGS |
FAQ:
1.Are your manufacturer or Trading Company?
First rigging is professional manufacturer, more than 20 years
experience.
2. What products do you supply?
1) Lifting link chain, Coal Mining chain
2) Round Master link
3) Other related products
3.What is your lead time?
Usually 25-30 working days after receiving your advance payment.
4.How do I receive the goods ?
FOB, CFR, CIF are most commonly used trade terms.
5.How do I pay?
TT(Telegraphic Transfer),30% payment in advance, 70% balance
before shipment.
experience.
2. What products do you supply?
1) Lifting link chain, Coal Mining chain
2) Round Master link
3) Other related products
3.What is your lead time?
Usually 25-30 working days after receiving your advance payment.
4.How do I receive the goods ?
FOB, CFR, CIF are most commonly used trade terms.
5.How do I pay?
TT(Telegraphic Transfer),30% payment in advance, 70% balance
before shipment.
TAG:
galvanised steel chain,
american standard chain,
stainless steel chain
- Similar Products