Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

40t Ebt Electric Arc Furnace Shell Internal Diameter 4800mm 32mva 20kv

Price $1000000.00
Min Order 1 Piece
Availability In Stock
Shipping From Zhejiang, China
Popularity 358 people viewed
Model NO.:
Arc furnace
Certification:
CE, ISO
Customized:
Customized
Surface Treatment:
Painted
Fuel:
Gas Coal Electric
Range of Applications:
Industrial
Type:
Cusomized
Place Style:
Vertical
Usage:
Steel Molding
Structure:
Horizontal Type
Brand:
Ville Industry
After-Sales Service:
Online Service
Warranty:
18monthes
Trademark:
Ville Industry
Transport Package:
Nude, Wooden Cases
Specification:
As per drawing
Origin:
China
HS Code:
851300020
Product Description
1. Technical parameter
1.1 Furnace capacity
      Nominal tapping capacity                                40t
      Average tapping capacity                                50t (Hot heel: 6-8t)
      Tap to tap time(tap 50t liquid steel)                 70 mins. (100% scrap, 2 times top charging)
      Method of charging                              Top (using charging buckets and hopper)
      Method of tapping                               EBT
1.2 Furnace body
      Shell internal diameter                           Ф4800mm
      Side wall construction                           Water cooled ,tubular
      Forward tilting angle (steel tapping)            20°
      Backward tilting angle (slag tapping)           12°
      Roof construction                                Water-cooled, tubular
      Roof lifting distance                             400mm
      Roof rotation angle                               65°
      Furnace door size                                1000mm×900mm (W×H)
1.3 Heavy current system
      Electrode diameter                               Ф500mm (UHP)
      Pitch circle diameter                             Ф1200mm
      Electrode lifting distance                        3100mm
      Electrode traveling speed                       9 / 6m/min (up/down, hydraulic driven)
      Short net Impedance                             ≤0.65+j3mΩ
     Three phase unbalance                           ≤5%

1.4 Furnace transformer & series reactor
      Transformer capacity                             32MVA+20% (long term)
      Primary voltage                                   20kV, 3P, 50Hz
      Secondary voltage                               650-500-350V (15 taps, ABB tap changer)
      Secondary current                                36950A
      Cooling mode                                    OFWF
      Reactor capacity                                 6MVar
      Reactor tap                                        100%, 70%, 50%, 25%, 0%
1.5 Hydraulic system
      Hydraulic working pressure                     12MPa
      Hydraulic medium                               Water-glycol (Buyer's scope)
1.6 Cooling water
      Water pressure                                    0.4MPa
      Inlet water temperature                          ≤35ºC
      Outlet water temperature                        ≤55ºC
      Total water circulation flow                     600 t/h
      Emergency water                                300 t (for 30mins. @ 0.25MPa)
      Water quality                                     Industrial clean water
1.7 Lance & carbon injection system
     Oxygen working pressure                       0.8-1.0MPa
     Oxygen flow rate                                2900Nm3/h (max.)
     Oxygen nozzle speed                            2 Mach
     CNG working pressure                          0.4MPa
     CNG flow rate                                         800Nm3/h (max.)
     Compressed air working pressure               0.8MPa
     Compressed air consumption                    600Nm3/h (max.)
     Carbon powder consumption                    20-30kg/min.
1.8 Others
      L.V. power installation capacity                100kW
      Furnace shell weight                             105t (with refractory lining)


2. Supply list & break down price list
SNItemQtyRemark
1Mechnical parts  
1.1Furnace body (upper shell and lower shell)1 set 
1.2Tilting mechanism1 set 
1.3Water cooled roof and water pipe1 set 
1.4Roof lifting and rotating mechanism1 set 
1.5Electrode arms and traveling mechanism1 set 
1.6EBT platform1 set 
1.7Rotation frame locking device1 set 
1.8Electrode nippling station1 set 
1.9Cooling water distributor1 set 
2Electrical parts  
2.1Transformer 32MVA/20kV c/w cooler1 setABB tap changer
2.2Reactor 6MVar/20kV c/w cooler1 set 
2.220kV high voltage system (GBC40.5kV panel)1 setVCB
2.3Short network with water cooled cables1 set 
2.4Lower voltage system1 set 
2.5PLC automation and HMI system1 setSiemens PLC S7-300
3Auxiliary items  
3.1Hydraulic power pack1 setProportional valve & pump make: Parker
3.2Compressed air device1 set 
3.3Lubrication station1 setXi'an or Qidong
3.4Water cooled door oxygen lance manipulator1 setwith hydraulic station
3.5CNG, oxygen, carbon wall lance (4 pcs.)1 setwith valves stand
3.6Steel temperature & measuring thermometer1 setwith LED display
4Others (packing, china trans., customs, etc)1 
 FOB china port price 

Supplied by the Buyer:
1) Installation and installation materials, Hydraulic medium, lubrication medium and cleaning medium, Graphite
   electrodes, Furnace refractory lining;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded
   furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is
   connected to Seller's H.V. panel and furnace transformer terminals, L.V. line is connected to Seller's L.V.
  distribution panel.


3. Delivery: 6 month after the Seller receiving down payment.

Workshop






Sales team:


  • Similar Products
Full Page Contact Supplier