$140.00
100 Square Meters (MOQ)
Factory Direct Steel Formwork Concrete Construction for Slab/Beam Mold Application Building Material
Kitsen Technologies Co., Ltd.
Swipe or use the arrows to view product images.
Adjustable Construction Column Steel Formwork for Viaduct
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 416 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a professional stencil making company, has its own 2 factories
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Steel formwork is strong and durable, therefore can be reused many times in construction. It is easy to assemble and erect. With fixed shape and structure, it is extremely suitable to apply to the construction for which much quantity of same-shaped structure is required, e.g. high rise building, road, bridge etc.
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a professional stencil making company, has its own 2 factories
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
- Similar Products
$25.00
100 Pieces (MOQ)
Universal Standard B Form Tie System Concrete Steel Formwork
QINGDAO QINYUAN STEEL CO., LTD.
$130.00
500 Square Meters (MOQ)
Steel and Aluminum Green Formwork for Slab Concrete
Qingdao Scaffolding Import and Export Co., Ltd.