Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Adjustable Mechanical Prop Jack Scaffolding and Steel Support

Price $4.00
Min Order 1000 Pieces
Availability In Stock
Shipping From Tianjin, China
Popularity 334 people viewed
Model NO.:
TYTS195
Material:
Steel
Type:
Scaffolding
Structural Style:
Multi-Pole Scaffolding
Framework:
Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
Single Row Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Props
Construction Properties:
Building Scaffold
Trademark:
tyt
Transport Package:
50 or 100PCS/Pallet
Specification:
Bs1139/En10217
Origin:
Tianjin, China
HS Code:
73084000
Product Description
Our factory mainly produces four type scaffolding shoring prop, standard shoring prop, light shoring prop, inside thread shoring prop and heavy duty shoring prop. Scaffolding shoring prop has a good market in 
middleeast and west Europe. It's widely used to construction, building bridge and high speed railway. As to surface treatment, shoring prop usually adapt to hot dip galvanized, electroplated and power coated, which are all depend on customers requirements.
Use: ideal support equipment of building, mining, tunnels, bridges, culverts and other construction projects.

The application method of adjustable steel support:
, Use the handle firstly to adjust the nut to the lowest position.
Insert the upper pipe into the lower pipe to close to the desired height. and then insert the pin into the adjustment hole located at the top of adjusting nut.
Shift the adjustable steel suppport on the working position, and use the handle to turn the adjusting nut, which can make the adjustable support to withstand the supported object.
 
NameSteel Prop Scaffolding
Place of OriginTianjin, China
BrandTYT

Size

(more customized size available)
 
Inner tube diameter(mm)Outer tube diameter(mm)Adjustable LengthThickness(mm)
40/4848/56/60
1600-2900mm

1800-3200mm 

2000-3600mm

2200-4000mm 
 
1.8/2/2.2/2.5/3
MaterialQ235 carbon steel
Surface treatmentHot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted
ColorOrange, dark red, blue, or as you required
Welding techniqueCO2 arc Welding
CertificationSGS;BV;EN12810
MOQ (Minimum Order Quantity)500 pieces
PaymentT/T  L/C
Delivery time20days after deposit
PackageWithout outer packing or as you required
Production capacity50 tons for each day
 Package Details 
Steel Prop Scaffolding20GP
Middle East Type Steel Prop Scaffolding1600PCS
Italian Type Steel Prop Scaffolding1700PCS
Spanish Type Steel Prop Scaffolding2000PCS

Looking forward to your kind inquiry!
Danny
  • Similar Products
Full Page Contact Supplier