$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Adjustable Steel Formwork for Concrete Construction
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 245 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our robust and resilient steel formwork is built to withstand the rigors of construction, ensuring multiple reuses. It offers effortless assembly and erection, making it the perfect choice for projects requiring uniform shapes like high-rise buildings, roads, and bridges.Packaging:
1. Typically, the total net weight for a loaded container ranges between 22 to 25 tons. This must be confirmed prior to loading.2. Customized packaging solutions for diverse products:
---Bundles: Suitable for timber beams, steel props, tie rods, etc.
---Pallet: Smaller parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer request.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, it generally takes 20-30 days after receiving the customer's down payment.
2. Transportation: Duration varies depending on the destination port.
3. Special requirements may necessitate additional negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a renowned stencil manufacturing company with two dedicated factories.
Q2: What services do you provide?
A: We specialize in designing and manufacturing formwork products utilized forbridges and tunnels.
Q3: What can you offer us?
A: We provide expert advice, detailed formwork layout drawings, and competitive quotations to project owners, design institutes, and contractors.
B: We sell our premium products to contractors, construction firms, material suppliers, and trading companies.
C: We support our global peers with our top-tier formwork products.
Q4: How long does it take to create a brief design and quotation after receiving the structural drawing?
A: Generally, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does manufacturing take after signing the contract?
A: Typically, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your payment terms?
A: 30% T/T in advance, with the balance due before shipment.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.