$200.00
100 Pieces (MOQ)
Light Waffle Slab Formwork for Concrete Waffle Formwork
Suzhou Topo New Material Co., Ltd.
Swipe or use the arrows to view product images.
Adjustable Viaduct Column Steel Formwork
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 252 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Information
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system boasts unparalleled strength and durability, allowing for multiple reuses in various construction projects. It's designed for easy assembly and erection, providing a fixed shape and structure that makes it ideal for projects requiring uniform structural elements, such as high-rise buildings, roads, and bridges.Packaging:
1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed before loading.2. Different products necessitate different packaging methods:
---Bundles: Suitable for timber beams, steel props, tie rods, and similar items.
---Pallets: Small parts are bagged and then placed on pallets for easy handling.
---Wooden Cases: Available upon customer's request for added protection.
---Bulk: Irregular goods are loaded in bulk inside the container.
Delivery:
1. Production: For a full container load, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation: The transit time depends on the destination charge port.
3. Special requirements may be accommodated through negotiation.
FAQ
Q1: Are you a trading company or a manufacturer?
A: We are a professional stencil-making company with two of our own factories.
Q2: What is your primary business?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.
Q3: How can you assist us?
A: We provide expert suggestions, formwork layout drawings, and quotations to owners, design institutes, and contractors involved in construction projects.
B: We supply our products to contractors, building companies, material suppliers, and trading companies.
C: We also support our global peers with our high-quality formwork products.
Q4: How long does it take to prepare a brief design and quotation after we provide the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products to be produced.
Q6: What are your terms of payment?
A: We require a 30% T/T payment in advance, with the balance due before shipment.
- Similar Products
$120.00
500 Square Meters (MOQ)
Panel Prop Shoring Formwork System for Concrete Construction
Qingdao Scaffolding Import and Export Co., Ltd.
$200.00
100 Pieces (MOQ)
Popular Ribbed (waffle) Slab Concrete Formwork for Construction
Suzhou Topo New Material Co., Ltd.
$200.00
100 Pieces (MOQ)
Customized Plastic Waffle Slab for Concrete Injection Moulding
Suzhou Topo New Material Co., Ltd.