Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Aluminum Formwork System Scaffolding Aluminum Quick Form System with Aluminum Panel for Building Material

Price $186.00
Min Order 100 Pieces
Availability In Stock
Shipping From Guangdong, China
Popularity 448 people viewed
After-sales Service:
Available
Warranty:
1 Year
Standard:
GB
Technique:
Hot Rolled
Surface Treatment:
Galvanized
Alloy:
Steel
Special Use:
Mold Steel
Usage:
Construction
Use:
Formwork
Building Material:
Building Matrial
Trademark:
DKS
Transport Package:
Package
Specification:
200*80
Origin:
China
HS Code:
73084000
Product Description
Aluminum formwork system scaffolding aluminum quick form system with aluminum panel  for building material 

 
 
ISO certificate

Factory 
DKS was established in 2005, located in Taishan, Guangdong Province, with convenient transportation and only two hours from Guangzhou.
DKS is committed to the production and marketing of scaffolding system, shoring system and formwork system including steel ringlock system, Mega beam, waler beam, shoring jack and others, Also other aluminum scaffolding products.
Located in Guangdong, the factory cover an area of 16,528 M2 and is specialized in the production of shoring and safety systems.
The factory is also equiped with modern and high-performance production tools and is ISO 9001 certified.



With ISO9001 and other qualifications, professional R&D and QC team can guanantee the quantity of products.
With 15 years of export experience in scaffolding production, DKS products are exported to the United States,USA, Australia, Germany, Japan, Spain and many other countries.
DKS aims to ensure safety in every work site alsong with its mission to bring happiness to its employees and contribute to society.
DKS adhere to the management principles of "quality first, ccustomer first and credit based" since the establishment of the company and always do our best to satisfy potential needs of our customers. DKS is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.
 
FAQ
1. What's your MOQ?
    MOQ is required for customized products(30 ton)
2. What's your payment terms?
    30% deposit, balance before delivery.
3. What's your delivery time?
    It depends on products, 45days to 70days after confirmed the order
4. Where is your factory?
  Our company is located in Taishan,Guangdong. Two hours to Guangzhou, shenzhen, four hours to Hongkong.
5. Can we visit your factory?
  Of course! Also we can help you to arrange airport pick up and hotel booking.

 

 

 
  • Similar Products
Full Page Contact Supplier