Swipe or use the arrows to view product images.
Aluminum Panel Main Front Entrance Pviot Door Security Mutil Point Smart Lock System House Entry Door
| Price | $500.00 |
|---|---|
| Min Order | 10 Square Meters |
| Availability | In Stock |
| Shipping From | Guangdong, China |
| Popularity | 359 people viewed |
After-sales Service:
5years
Warranty:
2 Years
Material:
Aluminum Alloy
Style:
European
Open Style:
Swing
Sound Insulation:
40
Screen Netting Material:
304 Net
Veneer Wood:
Customized
Position:
Exterior
Security Rating:
A
Surface Finishing:
Finished
Function:
Security, Decoration
Trademark:
Sinogar
Transport Package:
Standard Export Package
Specification:
2600H X 8000W
Origin:
China
HS Code:
7610100000
Product Description
Foshan Sinogar Aluminium Co., Ltd, There are800 staff working in 600,000 Square metre factory area in Guangdong. 15 sets of extrusion lines ranged from 500mt to 3600mt. Annual capacity reaches 80,000 tons.Our aluminium profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.
| Aluminium Alloy | 6063,6060,6061,6082 |
| Temper | T3-T8 |
| Quality Standard | GB/T 5237-2008, EN755-9,EN12020, JST,AA STANDARD. |
| Quality Certificate | ISO9001, ISO14001,OHSAS18001,DNV,QUALANOD, QUALICOAT |
| Useage | Folding door |
| Surface Treatment | Power coating: AKZO Noble, Tiger,DUPONT,JOTUN, etc. |
| PVDF: 2coated, 3 coated. | |
| Anodizing: Silver, Champagne, Bronze, Black, Gold, Imitating Steel,Titanium | |
| Wood grain: As per customers'samples. | |
| Polishing, Mechanical, Chemcial. | |
| Electrophoresis: Sliver,Champagne, Black, Golden,Titanium, etc. | |
| Processing | Drilling, Bending, Aluminium profile fabrication, Precise cutting ect. |
| MOQ | 3000 Kilogram |
| Packing | protection film + shrink plastic film or kraft paper. |
| Timber packing + Metal trolly; | |
| Payment Terms | TT 30% before production, the rest should be balanced before loading. |
1.Q:How long for the cutting dies and received sample?
A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.
2 Q:What is your lead time for production?
A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.
- Similar Products
$135.00
1 Square Meter (MOQ)
House Wrough Iron Metal Double Tempered Glass Entrance Door
Foshan Navaid Building Material Technology Co., Ltd.
$89.00
300 Pieces (MOQ)
European PVC Laminated Steel Door with Knock Down Frame Es-004
Zhejiang Kuchuan Door Co., Ltd.
$100.00
1 Piece (MOQ)
New Design and High Quality 9/10cm Steel Door (RA-S027)
Rafer Industry and Trade Co., Ltd.