Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Auto Corugation Stacking Machine up-Stakcer for 3-Ply Corrugated Sheet

Price $24000.00
Min Order 1 Piece
Availability In Stock
Shipping From Tianjin, China
Popularity 291 people viewed
Model NO.:
LM-A
After-sales Service:
Engineer Guides, Debugs and Video Instruction
Warranty:
3 Years
Condition:
New
Certification:
ISO 9001:2008, GB/T19001-2008
Automation:
Automatic
Suitable for:
Recycled Material, Paper
Paper Thickness:
Normal Specification Paper
Working Width:
1800mm
Design Speed:
150m/S
Max Stacking Length:
3500mm
Min Stacking Length:
500mm
Max Stacking Height:
1700mm
Control System1:
Servo Motro with Drive
Control System2:
Pneumatic Move
Trademark:
Ding Hao
Transport Package:
Film Wrapping, Wire Fixed, Oiled and Tray;
Specification:
Up-Stacker
Origin:
Dongguang County, Cangzhou City, Hebei, Chine
HS Code:
8441309000
Product Description


 
Product Parameters
Work Width(mm)1400-2500
Design Speed(m/min)150
Max. Stacking Height(mm)1400
Max. Stacking Length(mm)3500
 
Features
  • The corrugator stacker is designed with auto counting and auto stack change for stable and accurate switch.
  • The conveyor transmitting part is designed with pneumatic baffle, and the speed is controlled by the variable-frequency drive, allowing for stable and orderly stacking without sheet damage.
  • The stacking part features gantry design for lifting controlled by the variable frequency drive. When certain quantity is achieved during stacking, the sheet shall be auto shifted outside with variable-frequency drive control.
  • The baffle shall move backwards automatically during sheet output after stack shifting outside.
  • The size is electrically adjusted during shifting outside and the pneumatic brake is matched for walking.
  • Both sides at the output are equipped with paper stand, allowing for easy stacking and bundling.
Packaging & Shipping
 

 

FAQ

1. Are you manufacturer or trading company?
We are a combination of manufacturer and trading company.

2. What is the payment term you accept? 
We usually accept T/T. DP and LC are also ok for us.
We need 30% payment as deposit to arrange production and the balance should be paid before shipping.

3. What is your leading time in average? How much time needs for installation?
The manufacturing period for production line is 150 days since deposit is received and installation period is around 30 days.


4. How do we install and debug machine?
Engineer guides installation and debug machine via video or on site.

5. Where is factory? How can we visit there?
Factory is at Mianfang Road 36, Dongguang County, Cangzhou City, Hebei Province, China.
It is near to Beijing and Tianjin, so after you get Beijing or Tianjin airport, we will pick you up and take you to factory for inspection.

  • Similar Products
Full Page Contact Supplier