Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Automatic Potato Starch Production Line

Price Negotiable
Min Order 1 Set
Availability In Stock
Shipping From Beijing, China
Popularity 474 people viewed
Model NO.:
DLS85
Voltage:
380V
Certification:
ISO
Texture:
Stainless Steel
Useful Life:
25 Years
Shipping Port:
Tianjing
Trademark:
LIRETEC
Transport Package:
Sea Transportation
Specification:
Stainless steel
Origin:
Beijing, China
HS Code:
8438600000
Product Description
 

Advantages

 
1. High extraction rate 

Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%
2. Low water consumption 
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.
3. Large in capacity 

A Single max Potato starch production line can process more than 70 tons of cassava for per hour.
A Single max  starch production line can process sweet potato 60 tons per hour, can process 1000 tons corn per day.

The handling capacity of each production line can be customized.
4. Closed system 
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.
5. Fully automated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely. 

Main Equipments













Technical Parameter

 

FAQ

Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock, or it is 35days if the goods are not in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.

  • Similar Products
Full Page Contact Supplier