Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Automative Power Saving Electric Cable Wire Manufacturing Equipment and Production

Price $69800.00
Min Order 1 Piece
Availability In Stock
Shipping From Guangdong, China
Popularity 405 people viewed
Model NO.:
GEM-50MM/70MM/80/90/120MM
Driven Type:
Electric
Condition:
New
Certification:
CCC, RoHS, ISO, CE
Warranty:
12 Months
Screw:
Single-Screw
Usage:
Extruding
Motor:
Germany-Siemens
Inverter:
Siemens
Control Box:
International Standard
Mould Life:
300,000-1,000,000 Shots
Electric Element:
Siemens and Omron
Available Material:
PVC, PE, XLPE, Lshz
Conductor Suitable:
Copper, Tinned Copper, Aluminium
Demoulding:
Automatic
Trademark:
HOOHA
Transport Package:
Wooden Packing
Specification:
CE ISO
Origin:
Dongguan China
HS Code:
8479400000
Product Description
Automative Power Saving Electric Cable Wire Manufacturing Equipment and Production
                  ---------We make solutions and machines
                             Help installating and operating
                             Keep training and maintaining


1.  Professional and Strong Manufacture and Sells Team:
Team of HOOHA service
NameeducationPositionMainly responsible for projectSpecializing in project Industry working history    ( year )
zanyang XiecollegeGeneral EngineerThe total project design and planning power cable machine15
xioahua HucollegeVis general engineerThe total project design and planning net cable,data cable machine10
Chnaghong ChengcollegeEngineerDrawings and after-sales serviceTeflon,Optical fiber cable machine25
xiuwu ChencollegeGeneral EngineerThe total project design and planning copper drawing machine15
lixin YuancollegeEngineerThe project design and planning coppwer wire making technical16
zhenghai Qiucollegecable engineerAfter servicecable making and cable factory management servie15
jinxin LiucollegeMarketing engineerAfter serviceelectrical engineer7
xingguo TangHigh schoolElectrical engineerAfter serviceelectrical engineer10
changqiang LiHigh schoolMaintain engineerAfter servicemachina maintain and install service10
haipin LiUniversityEngineering director Marketing and salesproject consulting 8
sen YangUniversityEngineering translatorMarketing and salesproject consulting 5

Certication:

2.Spare Parts Brands:
Motor: Dongguan Motor , Teco, ABB, Siemens
Inverter : Japan Yaskawa, Siemens, Taiwan Teco
Temperature Control Meter: Japan RKC;
Auxiliary Relay: Japan Omron ;
Ammeter and Voltmeter: Taiwan Risesun ;
Indicator, Switch and Button: Taiwan TEND ;
Contactor: Taiwan Shihlin
Line Speed Meter: Taiwan FOTEK/Yangming
Bearing : NSK, SKF


Company Exhibition


3.Technique Specifications:
Line data:
- Process material: PVC/XLPE
- Process solution: single layer/ color stripping
- Conductor section: 0.75mm2to 10mm2 (single core)
                 Or up to 4 X 6 mm2multi core cable
- Insulation thickness: 0.5mm---1.5mm
- Size after insulation: 1.5mm---15mm
- Linear speed: Max. 450m/min (based on the cable diameter)
- Line axis height: 1000mm
- Machine color: Based on customer's requirement
- Machine direction: Based on customer's requirement
- Power: 3P/ 380V / 50Hz
- Total line length: about 30 m
 
Office and factory:

Consisting Components:
1,double-shaft pay-off rack
2,straightener platform
3,main extruder
4,automatic dryer and hopper
5,electric apparatus main control cabinet
6,Double layer movable trough
7,laser diameter gauge or Digital Diameter controller
8,high speed printing machine
9,double-wheels capstan
10,Meter counter
11,horizontal type wire-accumulator
12,power frequency sparker
13,double-shaft take-up machine

 Customer visit:


Optional:
1.Different take-up machine etc. 
2.Flyer pay-off or other pay off machine.
3.Taiwan or Swiss brand crosshead.
4.Copper pre-heater.
5.Talc applicator.
6.Different brand Laser diameter gauge.
7.Coiler on line
 Performance table
ItemConductor sectionInsalution thicknessCable diameterProduction speed
Unitemm2mmmmm/minkm/hr
10.750.62.345027
210.62.545027
31.50.62.845027
42.50.73.245027
540.83.937022
760.84.432019
81015.725015
92 X 1.51.27.61307.8
103 X 2.51.29.21106.6
114 X 41.211.5905.4
124 X 61.212.5804.8

Delivery:

4.Afetr service
1).Delivery dates: 45 days

2).Payment: TT or L/C
3).Packing: Wood packing and PE plastic packing ensure the goods safety on the transportation.
4). Install and training service: 2 professional engineers who has over 5 years overseas install and cable manufacture training experience.
5) after service phone number online

5.Contact information:


Phone: +8613763134250
Http//:hoohaco.en.made-in-china.com
Add:No. Beice District, Humen Town, 
Dongguan  City, Guangdong Province,China
 

6.Where are we:
Hongkong airport to Humen by boat 2 hours
Guangzhou airport to Humen by car 2 hours
Shenzhen airport to Humen by car 1 hour
Guangzhou South high speed train station to Humen 20 minutes
Shenzhen North high speed train station to Humen 20 minutes
  • Similar Products
Full Page Contact Supplier