Swipe or use the arrows to view product images.
Black Bearing Turntable Base, Boss Chair Swivel Disk, TV, Computer, Desk Base
| Price | $3.00 |
|---|---|
| Min Order | 1000 pieces |
| Availability | In Stock |
| Shipping From | Tianjin, China |
| Popularity | 385 people viewed |
Model NO.:
W1004
Material:
Iron
Color:
Black
Height Adjustable:
Unadjustable
Rotary:
Rotary
Finish:
Glossy Treatment
Customized:
Customized
Condition:
New
Suitable Place:
Chair Furniture Hardware Parts
Feature:
Eco-Friendly,Portable,Steady
Size:
Customized
Service Score:
Excellent
Trademark:
OEM
Transport Package:
Carton
Origin:
China
Product Description
| serial number | model | five inches | six inches | seven inches | eight inches | ||||||
| 01 | No pullback(360°) | 1.5mm | 1.5mm | 1.8mm | 2.3mm | 2.5mm | 2.0mm | 2.3mm | 2.5mm | 2.0mm | 2.3mm |
| 02 | with pullback(360°) | ||||||||||
FAQ:
TIANJIN CHRCASE FURNITURE TECHNOLOGY DEVELOPMENT CO., LTD.Product Description
Q1: How to order?
For retailers or individuals, please provide the item numbers shown on our website. If your order is small, we can help you order in bulk and ship it on a container. For wholesalers and import agents, please inform us about the item numbers and the required quantity. We will provide you with the lowest price for your mass production.
Q2: What are the payment terms?
We offer two payment options:
TT: Pay 30% in advance as a deposit. Once we arrange mass production, you can pay the remaining 70% balance against the copy of the Bill of Lading.
100% L/C at sight.
Q3: Can I mix items in one container?
Generally, we try to accommodate all requests from our clients. You can mix up to 5 items in one container. If you wish to mix more, please allow us to check and confirm.
Q4: Do you charge a sample fee?
We usually provide free samples, but the transportation fee should be paid by the buyer. However, rest assured that we will refund the fee when you place an order.
Q5: What is the lead time or delivery time?
After receiving a 30-45 day deposit, we can complete a 40'HQ container. For a 20'GP container, the lead time is within 25-35 days.
- Similar Products
$2.13
120 Pieces (MOQ)
Full Ball Bearing Ball Bearing Swivel for Furniture
Guangdong Weihua Hengsen Industrial Ltd.
$5.90
510 Pieces (MOQ)
250mm Swivel Chair Base Chair Parts for Modern Furniture
Guangdong Weihua Hengsen Industrial Ltd.