Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

C12200 Red Copper Coil Tube Pipe for Air Coditioner Water Tube

Price $7.00
Min Order 500 kg
Availability In Stock
Shipping From Shandong, China
Popularity 357 people viewed
Model NO.:
C12200 C12300
Type:
Copper Pipe
Application:
Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe
Material:
Red Copper
Shape:
Coil
Alloy:
Non-alloy
Color:
Red
Standard:
ASTM
Trademark:
BAODI
Transport Package:
Wooden Package
Specification:
C11000
Origin:
Yantai
HS Code:
7411109000
Product Description


 

Alloy T1,T2,C10100,C10200,C12000,C1220,C1100,
TP1,TP2etc.
Thickness0.1-500mm
WidthUp to 1800mm
Length Up to 6000mm
Hardness1/16 hard,1/8 hard,3/8 hard,1/4 hard,1/2hard,full hard,soft,etc
Applications1). Pancake Coil for ACR, General Engineering Applications
2). LWC Coil for ACR, General Engineering Applications
3). Straight Copper Tubes for ACR and Refrigeration
4). Inner-grooved copper tube for ACR and Refrigeration
5). Copper Pipe for Transportation System of water, gas and oil
6).PE-coated copper tube for water/gas/oil transportation system
7).Semi-finished Copper tube for industrial applications

 
Surfacemill,polished,bright,oiled,hair line,brush,mirror,sand blast,or as required
Packing                         Export standard  wooden pallets (as per requirements)   
Payment Terms30% T/T in advance as deposit,70% balance against the B/L copy or  L/C at sight
Minimum Order Quantity 3 tons per size
Delivery time 10-30 days after received L/C or deposit
Loading PortQingdao , China  (any port in China )
RemarkSpecific requirement of alloy grade, temper or specification can be discussed at your request
Payment TermT/TEXW30% T/T in advance, paid the balance before shipment
FOB
CFR30% T/T in advance,paid the balance before shipment
CIF
L/CL/C amount above 50,000 usd, we can accept L/C at sight
West UnionAmount lower than 1000usd
PayPalAmount lower than 1000usd
Delivery Time7~15days after receiving payment for one container
Payment TermT/TEXW30% T/T in advance, paid the balance before shipment
FOB
CFR30% T/T in advance,paid the balance before shipment
CIF
L/CL/C amount above 50,000 usd, we can accept L/C at sight
West UnionAmount lower than 1000usd
PayPalAmount lower than 1000usd
Delivery Time7~15days after receiving payment for one container







  • Similar Products
Full Page Contact Supplier