Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

CE Certified Hydraulic Press Metal Steel Tile Making Press Machine

Price $12500.00
Min Order 1 Piece
Availability In Stock
Shipping From Tianjin, China
Popularity 338 people viewed
Model NO.:
FO-Glazed
After-sales Service:
Parts Replacement
Warranty:
1year /2000 Work Hours
Tile Type:
Glazed
Certification:
CE, ISO
Condition:
New
Usage:
Roof, Wall
Transmission Method:
Electric
Shaft Material:
45#Steel with Heat Treatment
Power:
8kw
Raw Material Thickness:
0.3mm-0.8mm
Diameter of Shaft:
70mm
Roller Material:
45#Steel with Heat Treatment
Trademark:
Five Oceans
Transport Package:
Container
Specification:
8 m*1.3m*1.5m
Origin:
China
Product Description

Large span Pressing machine Specification

ItemUnitParameterRemark
MaterialType PPGI, PPGL, GI, GL, PPAL 
Thickness of Materialmm0.2-1.0mm
Weightkg 12000 kg
Material Widthmm914-1650
Production Speedm/minCommon speed:   0-5m/min
High speed: 30-60m/min
Effective Width of Productmm760-1260mm
Roller Material 45#, Cr12, GCr15, GCr12MoV
Power 220v 60hz 3 phrase or as your request
Drive Type By Chain or Gear or Gearbox
Motor PowerkW5.5-15kW
Brand of Electric Control System Delta or Siemens
Dimension ( L* W * H )m8 m*1.3m*1.5m
Product Details

HOT POPULAR Ag/Tuff Rib Panel 5 rib and PBR/R-Panel 4 rib NEW  DOUBLE DECK Roll Former Machine 

Popular TR4 TR5 TR6 /PV4 PV5 PV6 PROFILE PANEL ROLL FORMING MACHINE 



Application Effect
Packaging & Shipping
After-sales And Warranty

1. Warranty period: 1 year or 2000 working hours
2. Pay attention to the warranty scope
3. If the customer reports a quality problem, the following information must be provided:
1) Please verify the working time of the whole machine (nameplate photo, instrument photo)
2) Make a clear statement or cause analysis of the failure of the component (provide working environment, pictures, videos)
3) Give us feedback as soon as possible
FAQ

Q1:1:What is your minimum order quantity?
----1unit, customized service is available
Q2:How Long for lead time ?
----If the parts are in stock, it is usually delivered within 10 working days. Other customized styles take about 20 working days. It depends on the customer's requirements for the forklift
Q3:How long is your warranty period?
---1 year or 2000 working hours
Q4: What payment terms do you accept?
---1) T/T 30% in advance as deposit,70% before loading
---2)  T/T30% as deposit ,40% after inspection forklift ,30% before loading ----3) T/T20% as deposit ,50% after inspection forklift ,30% against BL copy
Q5:How about the shipping term ?
---1)LCL By Sea
---2)20GP/40HQ/45FT
---3)By Bulk Cargo

  • Similar Products
Full Page Contact Supplier