Swipe or use the arrows to view product images.
Carbon Steel Ductile Tube Pipe Strap Clamp for Seismic Sway Brace System
| Price | $3.09 |
|---|---|
| Min Order | 101 Sets |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 503 people viewed |
Model NO.:
UTT20Q-DN50
After-sales Service:
Online Guide Service or Provide Technicist
Material:
Carbon Steel &Ductile Iron Qt450
Shock Absorption Level:
High Performance
Size X":
2"
Size Dnxx:
DN50
Weight:
945g
Certifications:
UL
PCS/Box:
30
Box Size:
35*35*15
Box/Pallet:
54
Q'ty/Pallet:
1620PCS
Volume/Pallet:
1.24cbm
Standard:
DIN, ANSI, GB, JIS, Bsw
Surface Treatment:
Galvanized Sheet
Trademark:
UTTERLY
Transport Package:
Carton+Pallet/Wooden Case
Specification:
carbon steel
Origin:
China, Weifang
HS Code:
7326909000
Product Description
UTT20Q-DN50 Carbon Steel & Ductlie Iron Pipe Strap 2" Clamp Of Seismic Sway Brace System
Function: Designed for bracing pipe against sway and seismic disturbance. The pipe attachment component of a sway brace system used in conjunction with a UTT Manufacturing structural attachment fitting, and joined together with a bracing pipe element forms a complete sway brace assembly. Sway brace assemblies are intended to be installed in accordance with NFPA 13 and the manufacturer's installation instructions.
Type: Sprinkler Pipe Sch 10,Sch 40,GB/T 3091,JIS G3454
Size: Pipe size 2"(50) thru 8" (200).
Material: Carbon steel&Ductile iron QT450
Finish: Electro-galvanized
Approvals: UL & CE
Type: Sprinkler Pipe Sch 10,Sch 40,GB/T 3091,JIS G3454
Size: Pipe size 2"(50) thru 8" (200).
Material: Carbon steel&Ductile iron QT450
Finish: Electro-galvanized
Approvals: UL & CE
Install the pipe clamp to the pipe, then install the bolts and nuts as the shown picture. The accessories of UTT20Q use the sch40 1-inch pipe,The nuts torque of UTT 20Q need to reach 100~115N·M,After the installation of bolts & nuts and other accessories, the pipe must be clamped to the bottom of the accessories. After the installation of bolts & nuts and other accessories, the pipe must be clamped to the bottom of the accessories.
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
- Similar Products
$45.00
200 Square Meters (MOQ)
Seismic-Resistant Steel Structure Building Construction Materials Prefab Metal Workshop
Qingdao Ruly Steel Engineering Co., Ltd