Cassava Starch Processing Machine Modified Modified Gelatin Starch Machine
| Price | $40000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 477 people viewed |
modified starch production modified starch production line
Pre-gelatinized starch/Modified starch through mixing extruding, inflating, drying, crushing and packing to final products.
Pre-gelatinized starch/Modified starch making machine can product Denatured Starch, Pre-gelatinized starch is an effective and economical fluid loss agent in water based drilling fluids, which is a starch derivative. It is not bacterial degradation when at 120°C, environmentally acceptable and non-toxic. These products are usually used as food additives and industrial raw materials.
Flow chart of modified starch production line:
Mixer→screw conveyer→ extruder→ cooling Machine→air conveyer → dryer →air conveyer → Milling Set
corn starch, cassava starch, potato starch etc
Final products
twin screw extruder model option for customer to choose
| Model | Installed Power | Power Consumption | Production Capacity | Dimension |
| DSE-65 | 72kw | 50kw | 140-160kh/h | 14*2*4m |
| DSE-70 | 92kw | 65kw | 240-260kg/h | 14*2*4m |
| DSE-85 | 108kw | 75kw | 500-600kg/h | 21*2*4m |
| DSE-100 | 133kw | 106kw | 800-1000kg/h | 40*3.5*4.5m |
| DSE-120 | 142kw | 115kw | 15000-2000kg/h | 45*4.5*6.0m |
Service
1)Provide factory layout according to your factory size in advance;
2)Provide the basic formula;
3)Inspect the machine before leaving the factory; Oversea installation and commissioning equipment;
4)Technician will work with your workers together and teach your workers how to install machines, how to operate machines, how to maintain machines during daily working;
5)Our engineers will teach your workers how to clean the extruder, how to change the screw, how to change barrel etc, and provide technology support with you forever;
6)Provide English Version of Installation / Operation / Service / Maintenance Manual.
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shipment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q:do you supply any formula to buyer?
A: yes, we supply formulas to buyer.
Q: How about the machine warranty?
A: We provide 1 year warranty, Lifetime service
• Inside package is plastic film, outside is wooden or plywood case(based on the customers' need).
• We can supply fumigation package and certificate.
• Shipping, train, express or upon clients' demands.
- Similar Products