Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Cassava Starch Processing Machinery Cassava/Garri/Tapioca Starch Production Line

Price $700000.00
Min Order 1 Set
Availability In Stock
Shipping From Beijing, China
Popularity 438 people viewed
Model NO.:
LIRETEC-12
After-sales Service:
Debugging and Part Replacement
Warranty:
1year
Application:
Noodle, Dumpling, Bread, Dough, Empanada, Samosa, Making Starch
Voltage:
220V/380V/Other
Certification:
ISO, GB
Texture:
Stainless Steel
Shipping Port:
Tianjing
Control Type:
Fully Automatic Line or Manual Line
Two Type Line:
Cassava Flour(Garri) or Cassava Starch
Trademark:
LIRETEC
Transport Package:
Plastic Film and Wood Box
Specification:
Stainless Steel
Origin:
Beijing, China
HS Code:
8438600000
Product Description
Good Quality Cassava Starch Production Line and Good Quality Cassava Flour Production Line

Advantages

 
1. High extraction rate 

Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%
2. Low water consumption 
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.

3. Large in capacity 

4. Closed system 
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.

5. Fully automated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely. 

 

  • High extraction rate, extraction rate of 92% or higher
  • Low water consumption
  • Large processing capacity
  • Fast project progress
  • High product quality
  • Equipment package
  • Deep processing
  • High product quality
  • Stable system operation
  • Advanced technology
  • Independent intellectual property rights
  • Expert technical guidance
  • Short investment return period
  • Significant economic benefits 






 

Main Equipments













 
 
 

FAQ

Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock, or it is 35days if the goods are not in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.

  • Similar Products
Full Page Contact Supplier