Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Cement-Based Waterproof Coating Building Materials (Basement Waterproofing)

Price $1.65
Min Order 2000 kg
Availability In Stock
Shipping From Liaoning, China
Popularity 569 people viewed
Model NO.:
JS-1
Certification:
ISO, MSDS
Material:
Waterproof Coating
Property:
Waterproofing
Where to Use:
Roof
Customized:
Yes
Exposed Condition:
UV Resistant
Type:
Roofing and Waterproofing
Ceiling Tile Shape:
Liquid
Thickness:
1.5mm
Surface Treatment:
Spray Painted
Function:
Waterproof
Color:
Grey
Usage:
Outdoor, Indoor
Warranty:
3-5years
Ceiling Tile Type:
Acrylic
After-sales Service:
3-5years
Trademark:
EONZEAL
Transport Package:
Pallet
Specification:
20kg/pail
Origin:
China
Product Description
                                          JS Cementitious Waterproof Coating(two component)


Description
JS cementitious waterproof coating is made up by acrylic emulsion, cement and inorganic materials. The product is classified into type1 and type2 according to their different performance.
type1:  liquid: powder=1:1
type2:  liquid: powder=1:1.5
Features
  1. Environmental friendly, non- toxic, harmless and safe.
  2. High bonding strength, it can be bonded firmly with many types of mortar substrate.
  3. Can be applied on vertical , slope and top surface directly, no flow, easy to use.
  4. Good weather resistance, it can be applied on the outdoor roof without special protective layer (normal protective layer is needed).
  5. Excellent flexibility and low temperature resistance.
Technical Data
Implement Standard: GB/T23445-2009 
NO.ItemStandardResult
1
 
Solid content,% ≥≥7081
 
2Flexibility at Low Temperature, No Crack, ф10mm Stick-10ºC,No CrackPass
3Water Impermeability, 0.3Mpa, 30minImperviousPass
4Retention tensile strength  MPa≥≥1.21.9
5Elongation at break,%≥≥200239
6Adhesive Strength MPa≥≥0.50.8
Application
1.Surfaces  under  tiles  in  swimming  pools,  balconies,  rooms, bathrooms, kitchens
2. Shafts, water tanks (also potable water), silos
2. Underground surfaces of buildings, interior or exterior
4. Tunnels and motorway bridges
Installation
1. Mix the fluid and powder component together according to the percentage.
2. First put the liquid component in the barrel,then pour the powder and then mix two component by stirrer.
3. The first coat surface drying time is 4H, the temperature lower,the time longer.
4. When the first coat is dry,start the second coat until achieve the required thickness.
Recommended usage: 2.5kg/m2·mm
Packaging
Liquid: 20kg/bucket

Powder: 20kg/bag
Shelf life
The temperature from 5ºC to 40ºC, valid time is one and half a year.


 
 

  • Similar Products
Full Page Contact Supplier