Swipe or use the arrows to view product images.
Cheap Price Welding Projects Heavy Structure Steel Frame Machine Racks Machine Frame Rack
| Price | $2.15 |
|---|---|
| Min Order | 10 sets |
| Availability | In Stock |
| Shipping From | Guangdong, China |
| Popularity | 276 people viewed |
Model NO.:
NONE
Standard:
GB
Tolerance:
+/-0.10mm
Surface Treatment:
Powder Coated
Machining Method:
CNC Machining
Material:
Stainless Steel
Type:
OEM Sheet Metal Fabrication Parts
Service:
Customize ODM OEM
MOQ:
1 PCS
Trademark:
OEM
Transport Package:
Wooden Box or Carton
Origin:
Guangdong, China
Product Description
Factory Since 2009
founded by Mr. hui lee
Located in Jieyang, Guangdong Province, China
founded by Mr. hui lee
Located in Jieyang, Guangdong Province, China
TÜV Rheinland Verified
ISO 9001:2015
6 engineers with experience over 10 year in CNC machining and Steel fabrication fields.
3 QC inspectors
6 engineers with experience over 10 year in CNC machining and Steel fabrication fields.
3 QC inspectors
20+ skillful techincian workers
No MOQ
Key customers:
Nidec (Leroy-Somer), Sodick, Hedrich, Linscan, Pipecare, CAMaster, Nanfu, etc...
No MOQ
Key customers:
Nidec (Leroy-Somer), Sodick, Hedrich, Linscan, Pipecare, CAMaster, Nanfu, etc...
CNC Machining Aluminum Parts
Steel Welding Service
Mechanical parts processing
1.Are you a manufacturer or a trading company? We are a factory located in Jieyang, China since 1994, workshop are 38000 square ft (3500 square meters) | ||||||||
2.How can I get a quote? Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information. | ||||||||
3. Can I get a quote without drawings? Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation. | ||||||||
4.Will my drawings be divulged if you benefit? No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need. | ||||||||
5. Can you provide samples before mass production? Sure, sample fee is needed, will be returned when mass production if possible. | ||||||||
6. How about the lead time? Generally, 1-2 weeks for samples, 3-4 weeks for mass production. Depends on the drawing and quantity. | ||||||||
7. How do you control the quality? (1) Material inspection--Check the material surface and roughly dimension. (2) Production first inspection--To ensure the critical dimension in mass production. (3) Sampling inspection--Check the quality before sending to the warehouse. (4) Pre-shipment inspection--100% inspected by QC assistants before shipment. | ||||||||
8. What will you do if we are no satisfied with the quality? Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap | ||||||||
- Similar Products
$7500.00
1 Piece (MOQ)
618nc 57kn Main Power 3.75kw Fastener Insertion Machine
RSM Machinery Co.,Ltd.
$4.20
100 Pieces (MOQ)
Customized Stainless Steel Rod Wire Bending Springs Parts
Hebei Decai Metal Products Co., Ltd.