Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

China Factory Pouring Machine for Molding Line, Casting Machine

Price $8.20
Min Order 1000 Pieces
Availability In Stock
Shipping From Hebei, China
Popularity 331 people viewed
Model NO.:
Letong1036
Type:
Clay Dry Sand
Casting Method:
pressure Crystallization
Sand Core Type:
Clay Sand Core
Application:
Machinery Parts
Machining:
EDM Machining
Material:
Aluminium & Aluminum Alloy
Surface Treatment:
Sand Blast
Surface Roughness:
Ra0.2
Standard:
ASTM
Certification:
CE, RoHS
MOQ:
1 Set
Quality:
Very Good
User:
Casting Foundry
Trademark:
letong
Transport Package:
PP Bag+Carton+Crate
Specification:
0.2kg-11 ton
Origin:
China
Product Description

Product Specifications

Craft

Lost Wax Casting , Precision Casting , Investment casting , Dewaxing Casting , silica Sol Casting , Precision Die Casting , Sand Casting.

Material

Stainless Steel(General SUS304,SUS316,1.4301),etc.,Stainless Iron(General 201,420,430),etc.,High/Middle/Low Garbon Steel(A3,Q235,45),etc.,Alloy Steel(General 20cr,20crme,20crnimo,40crmo,40crnimo,42cr,42crme,42crnimo)etc.,Brass(H59,H62,H75,H80),etc.,Red Copper,Bronze,White Copper and other materials,The above menu is for reference only, if you have special needs,please contact customer service staff.

Process

Wax Injecting War repairing ,Tree Planting , Mucilage , dewaxing , investment , Shell Vibration , Polishing , etc... 48 Processes In TotaL.

Post-processing

Ordinary Polishing , Mirror Polishing , Electrolytic Polishing , Brushed Finishing , Grinding , Heat Treatment , Finishing , Drilling and tapping , Plating,etc.

Ordering Methods

We Can manufacture And Process According To Customer's Samples Or Dravings Designs;Meanwhile We Provide Some Ready Stock for Direct Order.

Mold Lead Tine

Rush Order : 3-5 Davs . General Lead Time:7-10Days ( Peculiar Product Exception)

Sample Lead Time

Urgent Sample : 3-5 days , General Lead Time : 5-7 Days ( Peculiar Product Exception )

Order Lead Time

Urgent Orders:10-15 Days , General Lead Time:15-20 Days ( Peculiar Product Exception )

Terms of Payment

The Mold wili Be made After 100% Payment Of The mold Fee , 50% Deposit Should Be Paid In Advance , The Balance Should Be Paid Before Shipment.

Shipping Port

Tianjin port

Tax & Freight

Price Quoted Without Freight&Tax included,For other requirements Please contact customer service staff

  • Similar Products
Full Page Contact Supplier