Swipe or use the arrows to view product images.
China Manufacturer 500L 15kw Air Compressor 15 HP 300L 300 Liter Mounted on Tank 20HP 11kw Integrated All in One 16 Bar Screw Compressor with Dryer
| Price | $1540.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Jiangxi, China |
| Popularity | 389 people viewed |
Model NO.:
GATD-20
After-sales Service:
Spare Parts
Warranty:
1 Year
Lubrication Style:
Lubricated
Cooling System:
Air Cooling
Power Source:
AC Power
Installation Type:
Stationary Type
Type:
Twin-Screw Compressor
Voltage:
220V/380V/440V/480V/575V/Customizable
Trademark:
GiantAir
Transport Package:
Wooden Package
Specification:
1500*700*1480mm
Origin:
China
HS Code:
8414804100
Product Description
Product Name:Direct Driven 4 in 1 Screw Air Compressor with 300L Tank and Air Dryer
Power: 7.5KW 10HP
Pressure: 8bar
Air Flow: 1.1m3/min
Motor: IP54 motor
Air End: Baosi Brand
Noise: 62±2dBA
Size: 1500*700*1480mm
Weight: 320kg
Power: 7.5KW 10HP
Pressure: 8bar
Air Flow: 1.1m3/min
Motor: IP54 motor
Air End: Baosi Brand
Noise: 62±2dBA
Size: 1500*700*1480mm
Weight: 320kg
| Model | Pressure | Air Flow | Power | Noise | Air Outlet Size | Weight | Dimensions |
| GATD-7.5 | 8bar/116psi | 0.7m3/min | 5.5kw/7.5hp | 62 | G 3/4 | 310 | 1550*700*1480 |
| GATD-10 | 8bar/116psi | 1.1m3/min | 7.5kw/10hp | 64 | G 3/4 | 320 | 1550*700*1480 |
| GATD-15 | 8bar/116psi | 1.5m3/min | 11kw/15hp | 66 | G 3/4 | 415 | 1600*780*1600 |
| GATD-20 | 8bar/116psi | 2.3m3/min | 15kw/20hp | 66 | G 3/4 | 415 | 1600*780*1600 |
| GATD-30 | 8bar/116psi | 3.3m3/min | 22kw/30hp | 66 | G 1 | 450 | 1600*780*1700 |
Q1: Warranty terms of your machine?
A1: One year warranty for the machine and technical support according to your needs.
Q2: Will you provide some spare parts of the machines?
A2: Yes, of course.
Q3: What about product package?
A3: We pack our products strictly with standard seaworthy case.
Q4: Can you use our brand?
A4: Yes, OEM is available.
Q5: How long will you take to arrange production?
A5: 380V 50HZ we can delivery the goods within 3-15 days. Other voltage or other color we will delivery within 25-30 days.
Q6: How Many Staff Are There In your Factory?
A6: About 100.
Q7: What's your factory's production capacity?
A7: About 2000 units per month.
- Similar Products