Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

China Manufacturer Custom 0.2mm Steel Stamping Rfi/EMI Shielding Case for PCB

Price $0.10
Min Order 5000 Pieces
Availability In Stock
Shipping From Guangdong, China
Popularity 334 people viewed
Model NO.:
20191125004
Type:
Cold Stamping
Processing Type:
Metal Spinning
Material:
Carbon Steel
Mould:
Multistep Progressive Dies
Surface Processing:
Plated
Fine Blanking:
Multi-Position
Process:
Forming Process
Industry:
Metal Stamping Parts
Tolerances:
0.1mm
Customized:
Customized
Sample:
Free If in Stock
Trademark:
SX
Transport Package:
Copy Paper + Carton
Specification:
8g
Origin:
China, Guangdong, Dongguan
Product Description
China Manufacturer Custom 0.2mm Steel Stamping RFI/EMI Shielding Case for PCB
Product details
Product nameemi shielding
MaterialSPCC
ProcessBending + Stamping
Finishelectrical plated
ColorWhite
OEMYes
PackageCarton
UsageTelecommunication
Images









Production Flow

Inspection equipments

Package

Delivery

Shipping way
 ExpressBy AirBy Sea
PriceHighMiddleLow
Weight50kg100-250kgAbove 400kg
Deliver time3-5 days10-15 days25-30 days

Company Information

Manufacturing Workshops

Certificates

Customers


FAQ

 

Q1: Are you a manufacturer or trading company?
A1: We are a Factory which has 16year-manufacturer in hardware products.

 

Q2: Do you provide ODM/OEM service?
A2: OEM / ODM is welcome, We got a professional and creative R&D team, and customized colors are optional. From the concept to finished goods, we do all ( design, prototype reviewing, tooling and production ) in the factory.

 

Q3: Where is your factory located? How can I visit it?
A3: Our factory is located in Dongguan, Guangdong, Dongguan is the Closest city to Shenzhen and Guangzhou, Hongkong. 1 hour from Guangzhou and shenzhen by car. 1.5 hours flight from Hong Kong ( 1 hour by car+0.5 hour by boat ).

 

Q4: Is it possible to know how are my products going on without visiting your company?
A4: We will offer a detailed production schedule and send weekly reports with digital pictures and videos which show the machining progress.

 

Q5: How can I get the sample? What's the lead time?
A5: Normally will be send in 7 days. If need to open new Model, need another 10-15 days more.

 

Q6: What's the lead time for mass production?
A6: 15-20 working days after down payment confirmed, can be negotiable.

 

Q7: How does your factory control product quality?
A7: ISO9001: 2008, ISO / TS16949 Certificated, independent quality control team with 16 inspectors in our factory. Third party certificated and factory audit accepted. Third party quality control accepted.

 

Q8: What about the payment terms?
A8: FOB shenzhen Port. 30% deposit by T / T, 70% before all shipment. 
We offer the photo, video or even Third Party to check.

 

Q9: If you make poor quality goods, will you refund our fund?
A9: As a matter of fact, we wont take a chance to do poor quality products. Meanwhile, we manufacture goods quality products until your satisfaction.


Products Show



More information about us,please click below :
 http://yubiao2018.en.made-in-china.com


  • Similar Products
Full Page Contact Supplier