Swipe or use the arrows to view product images.
China Steel Structure House Prefab House with Alc Panels
| Price | $320.00 |
|---|---|
| Min Order | 150 Square Meters |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 432 people viewed |
Model NO.:
RCB16
After-sales Service:
Installation Instruction
Usage:
Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Living House
Series:
Yd-M Series, Family House
Area:
150-300 M2, as Per Drawing
Bedroom:
2-5 Bedroom
Structure:
Steel Structure
Roof:
Flat Roof, Asphalt Shingle Roof, or Customized
Wall:
AAC/Alc Wall Panel with Plaster
Life Time:
50 Years
Advantage:
Quick Assembly
Customization:
Design and Materials
Keywords:
Prefab Family Holiday House
Use:
Living House, Farmhouse, Family House
Production:
25-30 Days, Depends on The Size
Installation:
14 - 30 Days, Depends on The Size
Certification:
ISO, CE
Customized:
Customized
Material:
Steel Frame+AAC Panel
Trademark:
Sinomega
Transport Package:
Material with Proper Package Before Loading Into C
Specification:
YD-M Series
Origin:
China
HS Code:
6811820000
Product Description
China Steel Structure House Prefab House with Alc Panels
Structure | steel structure + AAC wall panel | Life | 50 years |
Installation | 14 - 30 days, depends on the size | Production | 25-30 days, depends on the size |
Customization | Accept customization, customer's design. | Transportation | Depends on the size, contact us for details |
1. How long does it take to produce a constructive system?
Generally, 30 days are required to produce a villa or a steel structure building steel structure warehouse or after confirming the architectural drawing. This is indicated in the quote.
2. How many containers required for my project ?
After confirmation of your request , we send our shipping calculate weight and overall dimensions of all building materials department . After the calculation, we send you our answer.
In general, a 40-foot container is required for the transport of a building with an area of 80m2. Depends on different house.
3. What are the mandatory information to send you to get a quote?
After receiving your first inquiry, we will send you a complete array that contains all the information we need.
Generally, 30 days are required to produce a villa or a steel structure building steel structure warehouse or after confirming the architectural drawing. This is indicated in the quote.
2. How many containers required for my project ?
After confirmation of your request , we send our shipping calculate weight and overall dimensions of all building materials department . After the calculation, we send you our answer.
In general, a 40-foot container is required for the transport of a building with an area of 80m2. Depends on different house.
3. What are the mandatory information to send you to get a quote?
After receiving your first inquiry, we will send you a complete array that contains all the information we need.
4. can you come to my country to support me in completing the house?
Yes, we can arrange an engineer to go to you country to support you at site, and train your workers. So they will know how to do for next orders.
5. Is the building system resistant to hurricanes and earthquakes?
Ideally , the process of construction based modular steel frames has been developed in Japan to address critical environmental conditions. The strength of steel and modular construction allow the absorption of large loads generated during disasters. Buildings withstand earthquakes of level 5-6 on the Richter scale and cyclone with sustained winds up to 40m/s.
- Similar Products
$38.00
300 Square Meters (MOQ)
High Degree Construction Metal Industrial Workshop Steel Structure Workshop
Shenyang Libida Steel Structure Engineering Co., Ltd.
$1000.00
1 Square Meter (MOQ)
Pharmec Clean Room Systems & ISO Cleanroom for Pharmaceutical Manufacturing and Laboratories
Pharmec Technologies Co., Ltd.