Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Complete Bottle Water Liquid Beverage Production Plant From 2000bph to 20000bph

Price $100000.00
Min Order 1 Set
Availability In Stock
Shipping From Jiangsu, China
Popularity 357 people viewed
Model NO.:
CGF18-18-6
Type:
Volumetric Filling Machine
Automatic Grade:
Fully Automatic
Material Type:
Liquid
Filling Valve Head:
Multi-Head
Feed Cylinder Structure:
Single-Room Feeding
Dosing Device:
Plunger
Filling Principle:
Pressure
Packaging Container Lifting Structure:
Pneumatic Lifting
Structure:
Rotary
Packaging:
Bottle
Packaging Material:
Plastic
Advantage 1:
New Capping Head New Fracture
Advantage 2:
New Filling Frame
Advantage 3:
New Capping, Reflux Type
Advantage 4:
New Cap Elevator Avoid Cap Inverse
Guarantee:
One Year
Bottle Volume:
250ml,500ml,750ml,1000ml,1500ml,2000ml
Capacity:
2000bph,6000bph,8000bph,11000bph,3000bph,4000bph
Delivery Time:
40-50day
Suit Filling Liquid:
Water,Juice, Beer,Wine, Soda Water
After Sale Service:
Engineer Go Local Install, Train Buyer Use Maintai
Trademark:
tango
Transport Package:
Wooden Case
Specification:
24-24-8
Origin:
Zhangjiagang
HS Code:
8422301090
Product Description
  Product description:




 General description:

This machine adopt to bottle block neck transit technology, realize full auto sterilizer, bottle washing, juice filling or pulp filling,capping ect technology, high auto degree; pulp filling machine adopt to volume filling technology. Match complete temperature control system and reflux sytem, set complete auto cleaning system and control program, match liquid contact spare parts full use super stainless steel material and food degree rubber.

Parameter:

 
Model
(CGFB)
16-12-618-18-624-24-832-32-1040-40-1250-50-15
  Washing head161824324050
Filling head121824324050
Capping head668101215
Capacity(500ml)4000BPH6000BPH1000BPH1200BPH16000BPH24000BPH
Power3.8kw4.3kw6.5kw8.7kw9.5kw12kw
Overall size L*W*H3050*2000*2400mm3170*2070*2400mm4070*2350*2400mm5100*2600*2400mm6250*3050*2400mm7500*3900*2400mm

Auxiliary machines



Flow chart:





Client list bottle samples:





Factory photo:






Some key affair that client interest as follow:

Installation:

After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
We will send engineer, client pay ticket turn and back, and engineer each day usd50 cost.
 
How long time for installation?

 After machine arrive local, if client ready raw material, connect water pipeline and electricity, after prepared visa, we will send technician as client project situation to client factory, it will take about half month install, half month train custom engineer how to use and maintain machine.  

Training machine use and maintain

Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. 

Machine quality Guarantee

We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. We promise that the products of this line could storage for one year without adding any aseptic.

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

After sales

After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. 

 

Can we see machines operation at our country ?

A1: We have installed many project at many countries. If u need see, we need talk customer that who bought from us, if they allow, then we will tell u contact info , u can visit them.

We advise client come visit our company, u can know our company and see our machines operation at workshop.

We will arrange car go pick up from nearby train station or airport.

 Welcome local joint us.
 

We will supply technology:

We will make solution as client bottle size, workshop space,budget...

We can help client design bottle and label. Make workshop layout as space size.

 

Spare parts:

will send one year spare parts with machines together.

 
Are u trading company or manufacturer ?

We are manufacturer, we have own export company.

 

Delivery time: 30-60day
 

What info need to supply before we make offer solution.
 
  1. Bottle type , bottle size, capacity requirement
  2. Source water quality report.
  3. Machine requirement: or u can tell us u need label bottle type,finally product photo, we will give advice from our experience.
  • Similar Products
Full Page Contact Supplier