Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Complete Potato Starch Processing Machine

Price $50000.00
Min Order 1 Set
Availability In Stock
Shipping From Beijing, China
Popularity 297 people viewed
Model NO.:
LRT-A+
After-sales Service:
Debugging,Repair,Replacement of Parts
Warranty:
Debugging,Repair,Replacement of Parts
Application:
Making Starch
Voltage:
220V/380V/Other
Certification:
ISO
Texture:
Stainless Steel
Trademark:
LIRETEC
Transport Package:
Sea Transportation
Specification:
Stainless steel
Origin:
Beijing, China
HS Code:
8438600000
Product Description
Complete High Output Potato Starch Processing Machine

 

Our Advantages


1. High extraction rate 
Using multi stage hydrocyclones for concentrating, the advanced process design assure the extraction rate more than 92%

2. Low water consumption 
It needs 5- 8 tons of water for each ton starch, much less than those traditional equipments which need 15 - 25 tons water.

3. Large in capacity 
A Single largest starch production line can process 70 tons per hour  potato ,60 tons per hour sweet potato ,120 tons per hour cassava.

The starch production line  handling capacity can be customized.



4. Closed system 
All equipments and tanks are closed, they are connected by pipelines, there is no open device so that it can ensure that the production line has good performance and a clean and hygienic environment.

5. Fully automated design
It can save time and labor power, meanwhile the quality of the product produced is also guaranteed, such as the online cleaning function, it can make whole production system cleaned completely. 

Main Equipments










 

FAQ

Q:Are you a trade company or a manufacturer?
A:We are a manufacturer, and welcome to visit our factory and check the machines.
Q:How long is your delivery time?
A:Generally it is 10days when goods are in stock. We could discuss before contract.
Q:Could you supply all the parameters about the machines?
A:Yes, We will supply all the parameters, price layout drawing, factory desion etc.
Q:What is your terms of payment?
A:30% T/T in advance , 70% balance before shipment after in spection.
Q:How about the after-service?
A:We will send engineers to the buyer's factory for 7-14 days period installation and training to the operatiors.
Q:Do you supply any formula to buyer?
A:Yes, we supply formulas to buyer.

  • Similar Products
Full Page Contact Supplier