Swipe or use the arrows to view product images.
Completely Cement Bag Sack Production Line
| Price | $100000.00 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 369 people viewed |
Model NO.:
ZD-SPL-90/33/1000
After-sales Service:
Support
Warranty:
1 Year
Type:
PP Woven
Plastic Processed:
PP
Product Type:
PP Woven
Feeding Mode:
One Feed
Assembly Structure:
Integral Type Extruder
Screw:
Single-Screw
Engagement System:
N
Screw Channel Structure:
N
Exhaust:
Exhaust
Automation:
Automatic
Computerized:
Non-Computerized
Yearly Output:
0.5-100 Million Piece
Trademark:
ZD
Transport Package:
Woden
Specification:
2200KG
Origin:
Zhejiang
Product Description
| Type/Item | Diameter of extruder screw | L/D ratio of screw | Number of Die | Width of Die | Total power(kw) | Power of extruder motor(kw) | Weight |
| SJ-FMF105/ 1000B | 105 | 28:1 | 2 | 1000 | 58 | 18.5 | 5500kg |
| SJ-FMF105/ 1200B | 105 | 28:1 | 2 | 1200 | 70 | 18.5 | 6000kg |
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:How many days will you finish installing ?
A:We will finish installation and training within 15 days.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Q:How long is your machine's warranty period?
A: All our machine have half a years guarantee for electricity parts and one years
guarantee for mechanism, starting from finished installation.
5. Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.
6. Q:How could you do after one year warranty period?
A:We also can do service for you, but you need pay
salary for our technicians 80USD/day for each person.
7. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Q:Can you help us find any engineer in our location?
A:Of course, we will check and inform you as soon as possible.
9. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
- Similar Products
$28000.00
1 set (MOQ)
Flexible Stretch PVC Braid Pipe Production Line
Ningbo Jianghang Machinery Co., Ltd.
Negotiable
1 Set (MOQ)
Extrusion Coating & Laminating Machine for Flexible Packaging
Prime Converting Machinery Limited