Swipe or use the arrows to view product images.
Construction Fire Protection Zinc Coating Standard Pear Swivel Ring/Loop Pipe Hanger
| Price | $1.29 |
|---|---|
| Min Order | 1 Set |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 475 people viewed |
Model NO.:
Pipe Hanger
Standard:
DIN, ANSI, GB, JIS, BSW
Material:
Carbon Steel &Ductile Iron Qt450
Connection:
Forged
Surface Treatment:
HDG
Head Type:
Casting Head
Size X:
1/2"-10"
Size Xx:
DN15-DN250
Weight:
39g-430g
PC/Box:
22
Certificate:
CE /UL
Box Size:
35*35*15
Box Q'ty/Pallet:
54
Total Q'ty/Pallet:
1188
Volume:
1.24m³
Used for:
Sprinkler Pipe Sch 10, Sch 40,GB/T 3091, JIS G3454
Trademark:
Utterly
Transport Package:
Carton+Pallet/Wooden Case
Specification:
UTT40
Origin:
China, Weifang
HS Code:
7326909000
Product Description
Fire Protection Product Zinc Plate Standard Pear Band/ Swivel Ring/Cup Nut /Loop Pipe Hanger For Sprinkle Pipes
Swivel Ring Hanger
Function: Size:Pipe size1/2"(15) thru 10"(250)
Finish-Zinc plated. Other finishes upon request
Installation- It is the structural or transitional attachment component of a longitudinal or lateral sway bracing assembly. To install, insert the bracing pipe, or channel or angle bar into the clamp, and tighten the set bolt until set bolt head breaks off.
Qualification - Comply with CE and FM and UL listed.
Max Load (Lateral and Longitudinal) -2015 Lbs.
Function:
Recommended for the suspension of stationary non-insulated pipe lines.
Finish-Zinc plated. Other finishes upon request
Installation- It is the structural or transitional attachment component of a longitudinal or lateral sway bracing assembly. To install, insert the bracing pipe, or channel or angle bar into the clamp, and tighten the set bolt until set bolt head breaks off.
Qualification - Comply with CE and FM and UL listed.
Max Load (Lateral and Longitudinal) -2015 Lbs.
| Product Name | Seismic support system accessories |
| Seismic parts | Base/Connecting support frame/pipe clamp |
| Craftsmanship | Laser cutting, hydraulic forging |
| Product material | Carbon steel, ductile iron |
| Approval Standards | FM,UL Certificate |
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
- Similar Products
$0.30
1000 Pieces (MOQ)
M7 Pipe Clamps for 8mm-63mm Round Pipe with Rubber
Botou City Ruiyi METAL Products Co., Ltd.
$0.14
1000 Pieces (MOQ)
2024 Whol Sale Price M7 Pipe Clamps with Ruuber Protection
Botou City Ruiyi METAL Products Co., Ltd.
Negotiable
50 Pieces (MOQ)
Kt Construction Cutter Bits Am511
Liaocheng Kaituo Construction Machinery Co., Ltd.