$100000.00
1 Piece (MOQ)
Solids Control System for Drilling Rig Oil Field Mud Tank
Xi'an Hondin Energy Technology Co., Ltd.
Swipe or use the arrows to view product images.
Customized Drilling Fluid Mud Cycle Tank Liquid Container Storage Mixing Tank for Drilling
| Price | $8000.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Shaanxi, China |
| Popularity | 337 people viewed |
Model NO.:
ZCMT01
After-sales Service:
24/7
Warranty:
1 Year
Certification:
ISO 9001:2000, ISO 9001:2008
Type:
Waste Water Storage Tank
Model:
Zczsg40
Volume :M³:
40
Dimension:
11500X2800X2400
Function:
Water Mud Oil Storage
Product Name:
Water Storage Tank with Agitator
Trademark:
zhongcheng
Transport Package:
Wooden Case
Origin:
China
Product Description
Customized Drilling Fluid Mud Cycle Tank Liquid Container Storage Mixing Tank For Drilling
Product Description
Industrial water Tank
Used for supplying water to the main water pump of the drilling well site, as well as to the mud tank and circulation tank. Transport status small cans can be placed
Transport inside the large tank. The tank is equipped with a water pump, booster pump, overflow pipe, fire hydrant, sand cleaning door, etc.
Spec
Detailed Pic
Production Pic
Professional Manufacturers Water Supplying Circulation Storage Tanker
Why choose us ?
Q1. Are you a manufacturer?
Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided .
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty. and we provide very patient after service job .
Q3. Can we customize the equipment from you?
Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea usually
Q5. What's the lead time for the equipment and its spare parts?
Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.
Product Description
Industrial water Tank
Used for supplying water to the main water pump of the drilling well site, as well as to the mud tank and circulation tank. Transport status small cans can be placed
Transport inside the large tank. The tank is equipped with a water pump, booster pump, overflow pipe, fire hydrant, sand cleaning door, etc.
| Product Name | Model | Volume :m³ | Dimension |
| Water tank | ZCZSG40 | 40 | 10000x2500x2300 |
| Water tank | ZCZSG50 | 50 | 10500x2800x2350 |
| Water tank set | ZCZSG60 | 35+25 | 9500x2500x2300 |
| Water tank set | ZCZSG80 | 45+35 | 9500x2800x2400 |
| Water tank set | ZCZSG100 | 60+40 | 11500x2800x2400 |
Detailed Pic
Professional Manufacturers Water Supplying Circulation Storage Tanker
Why choose us ?
Q1. Are you a manufacturer?
Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided .
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty. and we provide very patient after service job .
Q3. Can we customize the equipment from you?
Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea usually
Q5. What's the lead time for the equipment and its spare parts?
Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.
- Similar Products
$49999.00
1 Piece (MOQ)
Drilling Fluid Mud Treatment Mud Cleaner/Mud Conditioner
Xi'an Hondin Energy Technology Co., Ltd.