Menu
Global B2B sourcing platform
Verified suppliers and manufacturers

Customized Drilling Fluid Mud Cycle Tank Liquid Container Storage Mixing Tank for Drilling

Price $8000.00
Min Order 1 Piece
Availability In Stock
Shipping From Shaanxi, China
Popularity 337 people viewed
Model NO.:
ZCMT01
After-sales Service:
24/7
Warranty:
1 Year
Certification:
ISO 9001:2000, ISO 9001:2008
Type:
Waste Water Storage Tank
Model:
Zczsg40
Volume :M³:
40
Dimension:
11500X2800X2400
Function:
Water Mud Oil Storage
Product Name:
Water Storage Tank with Agitator
Trademark:
zhongcheng
Transport Package:
Wooden Case
Origin:
China
Product Description
 Customized Drilling Fluid Mud Cycle Tank Liquid Container Storage Mixing Tank For Drilling 

Product Description


Industrial water Tank

Used for supplying water to the main water pump of the drilling well site, as well as to the mud tank and circulation tank. Transport status small cans can be placed

Transport inside the large tank. The tank is equipped with a water pump, booster pump, overflow pipe, fire hydrant, sand cleaning door, etc.

Spec 
Product Name ModelVolume :m³Dimension
Water tankZCZSG404010000x2500x2300
Water tankZCZSG505010500x2800x2350
Water tank setZCZSG6035+259500x2500x2300
Water tank setZCZSG8045+359500x2800x2400
Water tank setZCZSG10060+4011500x2800x2400

Detailed Pic

Production Pic


 Professional Manufacturers Water Supplying Circulation Storage Tanker


Why choose us ? 

Q1. Are you a manufacturer?

Yes, we have manufactured oilfield equipment for over 20 years. We can produce product according the spec customer provided . 

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty. and we provide very patient after service job .

Q3. Can we customize the equipment from you?

Yes,  actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea usually 

Q5. What's the lead time for the equipment and its spare parts?  

Generally 20 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15 days.







  • Similar Products
Full Page Contact Supplier