$150.00
300 Pieces (MOQ)
High Efficiency Factory OEM Grey/Ductile Cast Iron Pump Bracket Casting Parts
Tianjin Elecmotor Co., Ltd.
Swipe or use the arrows to view product images.
Customized Durable Ductile Iron Components for Precision Engineering Solutions
| Price | $1500.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Henan, China |
| Popularity | 483 people viewed |
Model NO.:
ductile cast iron
Type:
Clay Wet Sand
Casting Method:
Thermal Gravity Casting
Sand Core Type:
Clay Sand Core
Application:
Electronic Accessories
Machining:
Machining Center
Material:
Iron
Surface Treatment:
Sand Blast
Surface Roughness:
Ra6.3
Standard:
GB
Weight:
1kg~100kg
Packing:
Carton Box
Video Outgoing-Inspection:
Provided
MOQ:
1 PC
Delivery:
7-10 Days Depending on Qty
Trademark:
jing yan
Transport Package:
FIBC
Specification:
1KG~100KG
Origin:
Yu Zhou
Product Description
| Sand Core Type | Clay Sand Core |
| Machining | Machining Center |
| Surface Treatment | Sand Blast |
| Standard | GB |
| Transport Package | FIBC |
| Trademark | jing yan |
| Production Capacity | 2000ton/Year |
1. Geographical Location: Strategically situated within the Yazhuang Industrial Zone, this prime location is conveniently alongside the S325 provincial highway, offering unmatched logistical ease and efficiency.
1. How can I obtain a quotation?
To procure a comprehensive quotation, kindly furnish us with the following details: drawings, material specifications, weight, quantity, and any specific requests you might have.
2. If we lack a drawing, can you create one for us?
Absolutely! Our team is fully equipped to craft an exact drawing based on your provided sample, ensuring precise replication with meticulous accuracy.
3. When can I expect to receive the sample?
The sample will be expertly prepared within 15-20 days following the initiation of mold creation. The exact timeline may vary, contingent upon the specific nature of your product.
4. What is the typical lead time for orders?
The standard timeframe for order fulfillment is 20-25 days post-payment. However, this timeline is subject to variation based on the distinct requirements of your product.
- Similar Products
$6.80
100 Pieces (MOQ)
OEM Iron Casting Su190 Ductile Cast Iron Surface Metal Box
Hebei And Metals & Minerals Co., Ltd.
$242.30
10 Pieces (MOQ)
Sliding Beam for Steel Belt Sintering Furnace
Cangzhou Longda Metallurgical Machinery Co., Ltd.
$10.00
100 Pieces (MOQ)
Aluminum Casting Knuckle for Scaffold
Dongying Mcgear Machinery Equipment Co., Ltd