Swipe or use the arrows to view product images.
Customized Heavy Duty Stability Gray Cast Iron Brake Shoes for Railway
| Price | $40.00 |
|---|---|
| Min Order | 1 Piece |
| Availability | In Stock |
| Shipping From | Anhui, China |
| Popularity | 348 people viewed |
Model NO.:
Brake Shoes
After-sales Service:
1 Year
Warranty:
1 Year
Customized:
Customized
Certification:
ISO14001, ISO/TS16949, ISO9001
Type:
Train Brake
Standards:
AAR, Uic, En, GOST, Iris, Ksr, BS, JIS,Tb
Application:
Train, Railway Wagon, Passenger Car, Locomotive
Production:
Forging/Casting Production
Procesing:
Mould-Forging-Machining-Inspection
Certifications:
ISO9001, ISO14001, OHSAS18001,Tsi, AAR
Product Material:
42CrMo, 4140, 50mn, Customized Materials
Surface Treatment:
Polish and Paint
Service:
OEM\ODM
Color:
Black
Material:
Composite,Cast Iron
Trademark:
Kingrail Parts
Transport Package:
Wooden Box/Pallet
Specification:
Forging and Casting
Origin:
China
HS Code:
8705102300
Product Description
Brake shoes are used on the cars of railway trains to enable deceleration, control acceleration (downhill) or to keep them standing when parked.
Railway brake shoes from Kingrail Parts are specifically designed for the unique requirements of locomotive braking systems. Our brake shoes are made from high-quality materials, they are built to withstand the high forces and temperatures generated during locomotive braking.
With a range of sizes and designs available, our railway brake shoes provide reliable and consistent braking performance for locomotives, wagons, coaches of all types and sizes.
Specifications:
| Name | Railway brake shoe/block |
| Applications | Locomotive Parts for Passenger train or Cargo train. The Speed: ≤120km/h |
| Material | Frame: Q235; Body: Composite material |
| Braking Force | 1. High friction 2. Low friction |
| Service Life | >10,000km (Note: it must be replaced after 10,000 Km) |
| Surface Treatment | 1. Plain oiled 2. Painting |
1. OEM and customized service.
2. Full machining, primer coating, surface treatment.
3. Complete material testing process.
4. Quality control
1. How can I get the quotation?
Please send us information for quote : drawing, material, weight, quantity and request.
2. How long will be taken for sample production ?
Sample: 20-30 days for making mold and sample production . The accurate time depends on your product.
3. Can you accept Mini order ?
Yes . Mini order and trial order can be acceptable .
4. What is your Payment Term ?
Mold cost : 100% TT advanced. Main order: 40% deposit, balance 60% to be paid against the copy of B/L .
If you have any questions, pls feel free to contact us
- Similar Products
$450000.00
5 Pieces (MOQ)
East Railway General Railway Diesel Multiple Units (DMU) Passenger Train
Suzhou East Railway Co., Ltd.
$17.00
100 Pieces (MOQ)
High Quanlity AAR Train Parts Hand Hold
Rizhao Hongyu Electric Appliance Co., Ltd.
$50.00
100 Pieces (MOQ)
High-Load Capacity Forged Steel Brake Push Rod for Mining Locos
Hebei Chaoshan Fasteners Co., Ltd.
$10.00
20 Pieces (MOQ)
OEM Custom Metal Steel Rail Train Parts
Qingdao Evergreen Machinery Co., Ltd.
Negotiable
1 Piece (MOQ)
Next Generation Subway Train Hybrid Silicon Carbide Traction Converter
CRRC Yongji Electric Co., Ltd.