$3.00
1000 Pieces (MOQ)
Carbon Steel Casting Parts for Water Pump Parts
JOC Machinery Company Limited
Swipe or use the arrows to view product images.
Customized Precision Casting Brass Hook Investment Lost Wax Casting
| Price | $1.50 |
|---|---|
| Min Order | 50 Pieces |
| Availability | In Stock |
| Shipping From | Shandong, China |
| Popularity | 360 people viewed |
Model NO.:
OEM/ODM
Casting Method:
Thermal Gravity Casting
Process:
Precision Casting
Molding Technics:
Gravity Casting
Application:
Machinery Parts
Material:
Copper Alloy
Surface Preparation:
Sand Blast
Surface Roughness:
Ra6.3
Machining Tolerance:
+/-0.02mm
Standard:
AISI
Certification:
CE, RoHS, ISO 9001:2000, ISO 9001:2008
CNC:
in House
Heat Treatment:
in House
Polishing:
in House
Painting:
in House
Materials:
Stainless Steel, Steel Alloy, Brass
Trademark:
OEM/ODM
Transport Package:
Plywood Case
Specification:
Acc to customers requirements
Origin:
China
HS Code:
7325991000
Product Description
Customized precision casting brass hook investment lost wax casting
1.Auto castings
Truck / EGR Racing parts:Investment casting/lost wax casting/precision casting,surface coating,Dacromet,GEOMET,sand blasting,glass bead and shot blasting.
2. Flow control industry
Pump components:Investment casting,soluble core,stainless steel SUS304,SUS316 housing,cover,impeller,CNC in house.
Valve accessories:Investment casting,soluble core,stainless steel,CF8M,CF3M,WCB.
3. Hardware industry
Stainless steel polished hardware:surface mirror/brush polished stainless steel hardware,tactile indicator
4.Machinery parts:42Crmo4 steel alloy casting
5.Die casting: Zinc,aluminium alloy casting,surface power coating
7.Pipe fittings:stainless steel and malleable iron pipe fittings
| One stop site | Casting+CNC+Surface treatment all in house.Gurantee the delivery time. |
| 3D Prototype | Own 3D printing machine in house,help you to develope new parts in shortly time with lower cost. |
| Experiences | More than 24 years experiences,strict quality standard,guarantee the quality. |
| Shipping | Long-relationship shipping partners from factory to all over the world. |
1.How to get the quotation ?
We need full sizes 2D techncial drawing and 3D drawing,PDF format and .stp will be the best.If you don't have,just send us samples or your ideas.
2.Delivery time ?
Mold making time is 7-15 days,samples casting time is 8-15 days,CNC machining time is 2-4 days.
3.Main market ?
Germany,Japan,USA,Australian,Italy.
4.Contact ?
E:allen^lyhszy^com
- Similar Products
Negotiable
1 Piece (MOQ)
Cast Tube Support Bracket for Convection Section
Qingdao Hexin Machinery Co., Ltd.