$56.69
100 Square Meters (MOQ)
Environmentally Friendly Plastic Concrete Building Formwork 5.5cm Thick 5.5cm Wide
Hebei Leige Technology Development Co., Ltd.
Swipe or use the arrows to view product images.
Customized Steel Formwork for Viaduct Bridge Columns
| Price | $1050.00 |
|---|---|
| Min Order | 1 Ton |
| Availability | In Stock |
| Shipping From | Beijing, China |
| Popularity | 350 people viewed |
Model NO.:
Column template
After-sales Service:
Yes
Warranty:
One Year
Certification:
ISO
Material:
Steel
Type:
Column Formwork
ODM or OEM:
Yes
Size:
Customized
Thickness:
Customized
Transport Package:
Container
Origin:
Aoyu
HS Code:
7308900000
Product Description
Basic Info.
| Model NO. | AY86,AY106,AY126, | Material | Steel Wood |
| Type | Pier pillar formwork | Specification | Q235B |
| Panel thickness | 6mm | Width | 500-6000mm |
| Maxmum lateral pressure | 80 kn/square meter | Height | 2000mm |
| Guardrail height | 1200mm | Appliation scope | Roads,Railways,Water conservancy |
| Number of Platform | 2m/layer | Width of Operating Platform | 900mm |
| Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
| Origin | China | Production Capacity | 14000square meter/Month |
Product Description
Steel Formwork System
Our steel formwork system is designed for strength and durability, ensuring it can be reused multiple times in construction projects. Its ease of assembly and erection makes it incredibly efficient. With its fixed shapes and structures, it is ideal for projects requiring numerous identical shapes, such as high-rise buildings, roads, and bridges.Packaging:
1. The total net weight of a loaded container typically ranges from 22 tons to 25 tons, a detail to be confirmed before loading.2. We utilize various packaging methods depending on the product:
---Bundles: Used for timber beams, steel props, tie rods, etc.
---Pallets: Smaller parts are packed in bags and placed on pallets.
---Wooden Cases: Available upon customer's request for additional protection.
---Bulk: Irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production time: For a full container, we generally require 20-30 days after receiving the customer's down payment.
2. Transportation time: This varies depending on the destination port.
3. Special requirements: Negotiations are needed for any special conditions.
FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil making company with our own two factories.
Q2: What do you do?
A: We specialize in designing and manufacturing formwork products used forbridges and tunnels.
Q3: What can you do for us?
A: We provide expert suggestions, comprehensive drawings of formwork layouts, and competitive quotations to project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We support our global peers with our exceptional formwork products.
Q4: How long does it take to prepare a brief design and quotation once we provide the structural drawing?
A: Typically, it takes3
~7 days, depending on the specific requirements of the construction project.
Q5: How long does it take to manufacture the products after the contract is signed?
A: Generally, it takes 30~60 days, depending on the type and quantity of products required.
Q6: What are your terms of payment?
A: We require a 30% T/T advance payment, with the balance due before shipment.
- Similar Products
$130.00
500 Square Meters (MOQ)
Steel and Aluminum Green Formwork for Slab Concrete
Qingdao Scaffolding Import and Export Co., Ltd.
$101.00
500 Square Meters (MOQ)
Slab Pouring Steel Wood Zulin Construction Doka Table Formwork with Good Service
Beijing Zulin Formwork & Scaffolding Co., Ltd