Negotiable
1 Piece (MOQ)
Chinese 0.5 Ton Transmission Jack Supplier
JIAXING JACKSTAR TOOLS CO., LTD.
Swipe or use the arrows to view product images.
Die Cast Aluminum Zinc Alloy Tire Plug Installation Tool, 4" Needle, Repair Kit Heavy Duty
| Price | $0.99 |
|---|---|
| Min Order | 100 Pieces |
| Availability | In Stock |
| Shipping From | Zhejiang, China |
| Popularity | 278 people viewed |
Model NO.:
TRT-14
Certification:
ISO, CE, GS
Trademark:
Everwinner
Transport Package:
Standard Exporting Package
Specification:
SGS
Origin:
Ningbo, Zhejiang
HS Code:
820559000
Product Description
This listing is for a heavy duty tire plug installation tool exactly as pictured. The tool is die cast from aluminum. It comes complete with a 4" replaceable needle and sliding collar.
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our commodities in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A:T/T and L/C are often used. But it can be negotiable according to both parties situation. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The actual delivery time depends on the items and the quantity of your order.
Q5: Do you test all your goods before delivery?
A: Yes, we have quality control all through our production and have final inspection by QC with AQL standard before shipment.
Q6. Do you offer free samples?
Yes, we do. But the freight would be on the buyer's expense.
FAQ:
Q1. What is your terms of packing?
A: Generally, we pack our commodities in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A:T/T and L/C are often used. But it can be negotiable according to both parties situation. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The actual delivery time depends on the items and the quantity of your order.
Q5: Do you test all your goods before delivery?
A: Yes, we have quality control all through our production and have final inspection by QC with AQL standard before shipment.
Q6. Do you offer free samples?
Yes, we do. But the freight would be on the buyer's expense.
- Similar Products
$1.02
200 Pieces (MOQ)
Gpg-001 Bottom Type General Pressure Gauge
Yuyao Jinshan Yuan Instrument Co., Ltd.
$1.20
200 Pieces (MOQ)
Gpg-003 Axial Mounted Black Steel Ordinary Pressure Gauge
Yuyao Jinshan Yuan Instrument Co., Ltd.
$1.15
2000 Pieces (MOQ)
Air Pressure Gauge, 2' (2'[P-A-001])
Yuyao Jinshan Yuan Instrument Co., Ltd.
$150.00
20 Pieces (MOQ)
Double-Cylinder Hydraulic Transmission Jack (J02052)
JIAXING JACKSTAR TOOLS CO., LTD.